Nhon Trach Power Plant Todo List

Nhon Trach Power Plant Todo List
Huyndai's Task
P&ID
Datasheet
Deadline: 23/04/2021
Deadline: 23/04/2021
Package In charge
MR review
No Deadline - Follow Package Engineers
DD Quân:
Cirulating Pump
DO Storage Tank
NM Hoàng
Air Compressor and Dryer
Air Receiver and Filter
TN Quân
Service Gas (N2/CO2) Bottle Rack
Fuel Gas Package
NT Nghĩa
Diesel Emergency Generator
Crane/Hoist
Project Information
PMT Technical Information
Relating to HEC
Relating to Client
Link of refeering doc.
Basis of Design
Process Package Asignment List
DO pump
DO Recovery Storage Tank
H2 Plant
Service Water Storage Tank
Raw Water Pump
Instrument
Mechanical Package
Control Valves & Regulators
Actuated Valves
Pressure Relief Valves
Instrument
Mechanical Package
Electronic Transmitters
Gauges
Rotameters
Flowmeters
Mechanical Package
Instrument
RO/ FE and Flanges
Analysers
Tubing & Fittings
Phan Văn Thảo
Velocity Criteria
DOR
Mech General Requirement (material...)
Piping Material Guide
Process Piping Guide
PTSC's Assumption
PTSC's Equipment List
Mark-up
PTSC's P&ID Legend
Control Architecture
85