心智圖資源庫 BIM三維場地佈置解決方案梳理
關於BIM三維場地佈置解決方案梳理心智圖,包含深化目標、 深化流程-三維場佈建模流程、深化清單等。
This is a mind map about bacteria, and its main contents include: overview, morphology, types, structure, reproduction, distribution, application, and expansion. The summary is comprehensive and meticulous, suitable as review materials.
This is a mind map about plant asexual reproduction, and its main contents include: concept, spore reproduction, vegetative reproduction, tissue culture, and buds. The summary is comprehensive and meticulous, suitable as review materials.
This is a mind map about the reproductive development of animals, and its main contents include: insects, frogs, birds, sexual reproduction, and asexual reproduction. The summary is comprehensive and meticulous, suitable as review materials.
2024一建建築(持續更新)
半小時漫畫故宮
BIM在鋁模深化設計施工的應用
BIM在設計階段的技術應用
BIM正向設計流程
BIM三維場地佈置解決方案梳理
圖紙會審各專業內容要點
全製程工程諮詢服務專案中BIM的應用
全製程工程諮詢BIM應用梳理
深化目標
透過BIM技術,進行正向場地設計並建造 模,透過三維模型的審查,來優化場地的佈置,針對一些複 雜通用的構件節點,進行模型深化最佳化,輸出深化圖面與3D 渲染圖,指導工程現場的場地佈置,提高場地佈置的合理性 和場地的利用率。
透過分析優化場地佈置、出具場布構件及材料明細清 單,減少臨設變遷,降低現場安全風險,提升工程施 工效率與質量,達到降本增效的目的。
深化流程-三維場佈建模流程
圖紙收集
面目進場前一個月
收集電子版圖紙,包括建築總平圖,基坑圍護圖, 建築結構圖,初步的場地佈置圖等
應用交底
項目進場前半個月
BIM工程師在專案部進行技術規劃前對專案部進行相關工作綜合交底
各階段場佈建模
專案部負責對土方階段、主體階段、裝飾階段的場 地佈置進行建模,根據各項目特點,可對各階 段再進行細分。
模型深化最佳化
工程進場前10天
依CIS標準,由BIM工程師主導,現場專案技術負責配合,依專案特性、難點對模型進行調整最佳化,如施工道路,安全防護,塔吊佈置,生活設施及宿舍排布等。
成果交底
項目進場前3天內
BIM工程師主導專案技術負責人組織對三維場布進行各項成果審核交底會議
實施過程檢查
視專案進度而定
檢查實施過程中的落地情況,以了解落地中遇到的問題和困難。
總結完善
各階段過程結束後
根據場地佈置的實際效果和佈置中遇到的問題和提出的解決方法進行總結,並同時對三維場布指導手冊進行相應的優化和完善。
考核評價
各階段工程結束後
技術處對各執行流程狀況進行綜合評價,評價結果反映各項責任人績效
深化清單
施工場地整體佈置
場地圍牆、大門以及門衛
八牌二圖,旗壇定位
貨櫃式茶水亭、吸煙室
樣板展示區
標養室
配電房
各類導引牌
場內施工道路及人車分流
班前講評台
現場消防設施
現場臨電佈置
基坑階段
支撐維護
運土坡道、施工棧橋
洗車槽、秤定位選型
基坑人行通道
主體階段
擬建建築
塔吊定位選型
人貨梯定位
人貨梯及塔吊基礎與防護
現場各加工場地及加工棚
安全通道
辦公區
辦公大樓選用定位及外觀觀感做法
辦公區景觀綠化
停車位佈置
圍牆及大門
場內道路
生活區
民工宿舍選型排布
廚房及餐廳
廁所及浴室
盥洗及晾衣區
體育活動設施
非機動車停放點
停車位
措施類深化設計應用-BIM三維場地佈置