MindMap Gallery Water conservancy project costs
This is a mind map about water conservancy project costs. The main contents include: financing interest during the construction period, reserve fees, independent fees, equipment fees, construction and installation engineering fees.
Edited at 2024-04-08 19:41:19This Valentine's Day brand marketing handbook provides businesses with five practical models, covering everything from creating offline experiences to driving online engagement. Whether you're a shopping mall, restaurant, or online brand, you'll find a suitable strategy: each model includes clear objectives and industry-specific guidelines, helping brands transform traffic into real sales and lasting emotional connections during this romantic season.
This Valentine's Day map illustrates love through 30 romantic possibilities, from the vintage charm of "handwritten love letters" to the urban landscape of "rooftop sunsets," from the tactile experience of a "pottery workshop" to the leisurely moments of "wine tasting at a vineyard"—offering a unique sense of occasion for every couple. Whether it's cozy, experiential, or luxurious, love always finds the most fitting expression. May you all find the perfect atmosphere for your love story.
The ice hockey schedule for the Milano Cortina 2026 Winter Olympics, featuring preliminary rounds, quarterfinals, and medal matches for both men's and women's tournaments from February 5–22. All game times are listed in Eastern Standard Time (EST).
This Valentine's Day brand marketing handbook provides businesses with five practical models, covering everything from creating offline experiences to driving online engagement. Whether you're a shopping mall, restaurant, or online brand, you'll find a suitable strategy: each model includes clear objectives and industry-specific guidelines, helping brands transform traffic into real sales and lasting emotional connections during this romantic season.
This Valentine's Day map illustrates love through 30 romantic possibilities, from the vintage charm of "handwritten love letters" to the urban landscape of "rooftop sunsets," from the tactile experience of a "pottery workshop" to the leisurely moments of "wine tasting at a vineyard"—offering a unique sense of occasion for every couple. Whether it's cozy, experiential, or luxurious, love always finds the most fitting expression. May you all find the perfect atmosphere for your love story.
The ice hockey schedule for the Milano Cortina 2026 Winter Olympics, featuring preliminary rounds, quarterfinals, and medal matches for both men's and women's tournaments from February 5–22. All game times are listed in Eastern Standard Time (EST).
Water conservancy project costs
Construction and installation engineering fees
direct fee
Basic direct fee
Labor cost
Basic wage
Auxiliary salary
material fee
Original price of materials
Transport fees
Transportation insurance premium = original price of materials × material transportation insurance rate
Procurement and storage fee = (original price of materials + transportation and miscellaneous charges) × procurement and storage rate
Construction machinery usage fees
Depreciation
Repair and replacement equipment fees
Installation and disassembly fees
On-board labor charges
Power and fuel costs
Other direct costs
Additional construction fees during winter rainy season
Additional fee for night construction
Additional fees for construction in special areas
temporary facility fee
Safety production measures fee
other
Construction tools and equipment usage fees
Inspection and testing fees: costs incurred for general appraisal and inspection of building materials, components and building installations, excluding testing fees for new structures and new materials and testing of materials with factory certificates required by the construction unit, and testing of components. Destructive testing.
Engineering positioning retest and construction control network test equipment
Project delivery and completion site cleaning
Maintenance fees before the project and equipment and instruments are handed over to production
Project acceptance testing fee
overhead
Fees
social Security fee
Pension insurance premium
unemployment insurance premiums
medical insurance premium
Work injury insurance premium
maternity insurance premium
housing fund
Business management fees
Management salary
Travel and transportation expenses
office expenses
Fixed asset usage fee
Tool usage fee
employee benefits
Labour protection fee
Union funds
Employee education expenses
insurance
Business property insurance
Insurance costs for management vehicles, etc.
Safety insurance premiums for special types of work such as high-altitude, underground, cave, water, and underwater operations
Dangerous work accident insurance premium
Financial expenses
taxes
property tax
Management vehicle use tax
stamp duty
Urban maintenance and construction tax
Education surcharge and local education surcharge
other
profit
Material compensation
taxes
Equipment costs
Equipment original price
Equipment transportation and miscellaneous expenses
transportation insurance premium
Purchase and storage fees
independent fees
Construction management fee
Construction unit start-up expenses
Construction unit personnel costs
project management fee
Meeting and travel expenses
Project publicity fee
Land use tax, property tax, stamp duty, contract notarization fee
Audit fees
Water regime, hydrology, sediment, meteorological monitoring fees and flood reporting fees required during the construction period
Project inspection fee
Educational funds, office expenses, travel and transportation expenses, conference fees, transportation vehicle usage fees, etc. for construction unit personnel
Tendering business fee
Economic and technical consulting fees
Subsidy fees for the public security and fire department dispatched to the construction site and other project management fees
Engineering construction supervision fees
Joint trial freight
production preparation fee
Scientific research survey and design fees
other
Engineering insurance premium
Other taxes
reserve fee
basic reserve fee
Increased costs due to design changes
Increase in costs due to force majeure
Increased costs caused by large-scale excavation during acceptance of concealed projects and restoration at the end of acceptance
spread reserve fee
Increased investment due to increases in labor wages, material and equipment prices, and adjustments to fee standards
Financing interest during construction period