MindMap Gallery Activities at various stages of the project life cycle in automotive related industries
Dear friends in the automotive industry, I have sorted out the activities at each stage of the entire life cycle of automotive-related industry projects, and systematically sorted out all the activities at each stage. Treasures, collect them with one click.
Edited at 2022-05-11 07:51:57Ce calendrier annuel, créé avec EdrawMax, présente une disposition claire et organisée des mois de janvier à décembre. Chaque mois est affiché dans un cadre distinct, montrant les jours de la semaine et les dates correspondantes. Les weekends (samedis et dimanches) sont mis en évidence pour une meilleure visibilité. Ce format est idéal pour la planification et l'organisation des activités tout au long de l'année, offrant une vue d'ensemble rapide et facile à consulter.
This quarterly calendar overview for 2026, created with EdrawMax, presents a structured and colorful layout of the entire year divided into four quarters. Each quarter is displayed in a separate column, showcasing the months within that quarter in a clear grid format. The days of the week are labeled, and each date is marked within its respective cell, allowing for easy identification of dates across the year. This calendar is an excellent tool for long-term planning, providing a comprehensive view of the year at a glance.
This weekly calendar for 2026 is designed using EdrawMax to provide a detailed and organized view of each week, starting from January. The left side features a mini monthly calendar for quick reference, highlighting the current week in yellow. Below it, there's a section for weekly goals to help prioritize tasks. The main area is a time-grid from 6:00 AM to 12:00 AM, divided into half-hour slots, allowing for precise scheduling of daily activities throughout the week. This layout is ideal for managing a busy schedule efficiently.
Ce calendrier annuel, créé avec EdrawMax, présente une disposition claire et organisée des mois de janvier à décembre. Chaque mois est affiché dans un cadre distinct, montrant les jours de la semaine et les dates correspondantes. Les weekends (samedis et dimanches) sont mis en évidence pour une meilleure visibilité. Ce format est idéal pour la planification et l'organisation des activités tout au long de l'année, offrant une vue d'ensemble rapide et facile à consulter.
This quarterly calendar overview for 2026, created with EdrawMax, presents a structured and colorful layout of the entire year divided into four quarters. Each quarter is displayed in a separate column, showcasing the months within that quarter in a clear grid format. The days of the week are labeled, and each date is marked within its respective cell, allowing for easy identification of dates across the year. This calendar is an excellent tool for long-term planning, providing a comprehensive view of the year at a glance.
This weekly calendar for 2026 is designed using EdrawMax to provide a detailed and organized view of each week, starting from January. The left side features a mini monthly calendar for quick reference, highlighting the current week in yellow. Below it, there's a section for weekly goals to help prioritize tasks. The main area is a time-grid from 6:00 AM to 12:00 AM, divided into half-hour slots, allowing for precise scheduling of daily activities throughout the week. This layout is ideal for managing a busy schedule efficiently.
Activities at each stage of the project life cycle
Quotation stage
Customer information collection
1. Model production, 2. Model benchmarking, 3. New customer brand power analysis, 4. Lamp information (new processes, new technologies, etc.), 5. Project development cycle, 6. Development requirements (RFQ, various agreements, etc.)
Marketing Department
New project pre-project evaluation
"New Project Pre-Project Evaluation Form" project information
Project Department
Project property definition
"New Project Pre-Project Evaluation Form" "PMO meeting results"
Marketing Department
Build a quotation team
"Minutes of Manager's Office Meeting"
Marketing Department
Interpretation of customer needs
"New Product Development Requirements" (RFQ, design brief and various agreements, etc.)
Project Department
Quotation plan output
"New Product Development Requirements" (RFQ, various agreements, etc.) "Customer Demand One Dollar Table" (TR Report)
Department of Design
Quotation plan review
"Pricing proposal"
Design Department/Project Department
Development cost assessment
"Customer Quotation Information"
Project Department
Product cost calculation
"Pricing proposal"
Finance Department
Life cycle gross profit analysis
"Material Cost" and Investment Cost
Finance Department
Customer quotation
"Material Cost" and Investment Expenses, "Life Cycle Gross Profit Rate Statement"
Marketing Department
Technology Exchange
"TR Plan"
Project Department/Design Department/Marketing Department
Project establishment stage
Internal project approval
Customer designated notification
Project team established
Customer designated notification/design brief (RFQ)
Project development goals
Project development budget
Project kick-off meeting
"Customer Designated Notice" "New Product Development Proposal" "Project Organizational Structure Checklist" "Project Initiation Meeting Minutes"
design phase
design input review
design input review
"Customer Demand One Dollar Table" "Competitive Product Benchmark"
DFMEA
DFMEA analysis review (structure)
"Customer Demand One Dollar Table" "Design Brief"
"Product Special Characteristics List-Structure" "DFMEA-Structure"
DFMEA Analysis Review (Electronic)
"Customer Demand One Dollar Table" "Design Brief"
"Product Special Characteristics List - Electronics" "DFMEA-Hardware" "DFMEA-Software"
PFMEA
PFMEA analysis (structure)
"Product Special Characteristics List-Structure" "DFMEA-Structure" "DFMEA-Structure" review opening items
PFMEA Analysis (Electronic)
"Product Special Characteristics List - Electronics" "DFMEA-Electronics" "DFMEA-Software" "DFMEA-Electronics" review opening items "DFMEA-Software" review opening items
Design
Lamp function definition
"Design Brief" "Customer Style Input"
Patent inspection
"Design Brief" "Customer Style Input"
New regulatory inspection
"Design Brief" "Customer Style Input"
Standard parts application
"Design Brief" "Customer Style Input"
Optical analysis
"Design Brief" "Customer Style Input"
Electronic solution analysis
"Design Brief" "Customer Style Input" "Luminous flux flow table"
thermal analysis
"Design Brief" "Customer Style Input" "Luminous flux flow table"
Feasibility Analysis
"Design Brief" "Customer Style Input"
Process planning
"Design Brief" "Customer Style Input"
Styling plan review
"Structural Analysis Report" "Technical Review Checklist" "3D Data" "2D Drawings" "Cost changes" "Customer Demand One Dollar Table"
Self-made outsourcing reservation point
"Styling BOM" "Customer Demand One Dollar Table"
Process planning kick-off meeting
"Parts Self-made Outsourcing Agreement Points List" "3D Data" "2D Drawings" "Styling BOM" "Customer Demand One Dollar Table"
Electronic proposal review
"Electronic Mission Statement"
Electronic process planning
"Electronic Mission Statement" "DFMEA-Electronics" "PFMEA-Electronics"
Production line capacity analysis
"Process Planning" "Initial Process Flowchart"
Supplier intention setting
"Parts Self-made Outsourcing Agreement Points List" "3D Data" "2D Drawings" "Styling BOM"
Modeling sample development
"3D Data" "2D Drawings" "Customer Demand One Dollar Table"
Modeling sample review
"Styling Samples" "Modeling Sample Data Review Minutes"
style freeze
"Styling Samples" "Modeling Data Review Minutes"
Styling Freeze Cost Calculation
"Shape Freeze BOM"
Mold start
"Shape frozen 3D data"
Outsourced mold designated location
"Mold Specification" "Mold List"
Equipment feasibility analysis
"Process Planning" "Initial Process Flowchart"
Structural design
Develop product testing program
"Design Brief" "Laws and Regulations"
structural analysis
"Modeling Data Review Minutes"
Structural optimization
"Structural Analysis Report"
"Structural Analysis Report" "3D Data" "Luminous flux flow table" "Lamp Function Definition"
Electronic Plan A Design
"Luminous flux flow table"
thermal analysis
《PCB Layout》 "Electronic Schematic"
software design
"Design Brief" "Customer Demand One Dollar Table" "Electronic Hardware Schematic" "Software and Hardware Interface Description"
Mold design
"3D Data"
Process planning and refinement
"Structural Analysis Report" "3D Data"
Structural plan review
"Structural Analysis Report" "Technical Review Checklist" "3D Data" "2D Drawings" "Cost changes" "Customer Demand One Dollar Table"
Process planning & three major document review
"Process Planning Plan" "Initial Process Flowchart"
Software design review
"Software Requirements Specification" "Software Architecture Detailed Design" "software program" "Software Testing Outline"
PCB Layout review
《PCB Layout》
Electronic process planning review
"Electronic Process Planning"
Optical sample development (if necessary)
"Prototype Production Instructions"
Structural plan optimization review
"Structural Plan Review Record"
Electronic B-like design
"Software Flowchart Review Record" "PCB Layout Review Record"
Assembly equipment review
"Process Equipment Design Task Book"
Mold review (The purchasing department is responsible for outsourcing molds)
"Mold 3D Data" "Mold Flow Analysis Report" "Appearance Clamping Report"
homemade foreign treaty points
"Self-Made Outsourcing List"
Inspection tool planning
"Customer Demand One Dollar Table" "Product 3D Data"
Data freeze review
"Structural Analysis Report" "Technical Review Checklist" "3D Data" "2D Drawings" "Cost changes" "Customer Demand One Dollar Table"
Electronic freeze review
"Software Design Document" 《PCB Layout》 "Electronic Process Planning"
Tooling Design Freeze Review
"Workwear Design Task Book" "Customer Demand One Dollar Table" "Workwear 3D Data"
data freeze
"Data Freeze Review Record"
Outsourced parts fixed point
"Self-Made Outsourcing Checklist"-Final Edition "Parts BOM" "2D\3D Data"
Process planning freeze
"Process Planning Plan" "Three Major Documents"
Mold design plan frozen
"Mold Review Record"
Tooling design plan frozen
"Minutes of Workwear Freeze Review Meeting"
Inspection tool design plan frozen
"Inspection Tool Design Plan Review"
Packaging plan planning
"Product 3D Data"
Data Freeze Cost Calculation
"Data Freezing BOM"
Summary of design stage
"Design Phase Checklist"
development stage
Process development of tooling, molds and inspection tools
Mold development progress tracking
"Mold Development Schedule"
Tooling development progress tracking
"Tool Development Schedule"
Inspection tool development progress tracking
"Inspection Tool Development Schedule"
Product test plan preparation
"Product Test Plan" "Customer Test Requirements"
Test tooling development
"Test Equipment Designated List"
Test tooling development progress tracking
"Test Tooling Processing Schedule" "Test tooling inspection report"
Trial mold verification
"Process card" "Mold Trial Resume"
Outsourced software development
Outsourced parts development
"Defined Point for Outsourcing Parts" "3D Data"
Outsourced parts outsourcing
"Product Supporting Agreement"
Outsourced parts development progress and quality tracking
"Outsourcing Development Schedule"
Product trial production
Pre-acceptance of inspection tools
"Inspection Tool Pre-Acceptance Report"
Test tooling acceptance
"Test Tooling Acceptance Report"
Assembly product T0 production
Implement according to the "Quality Gate Checklist"
Assembly product T1 production
Implement according to the "Quality Gate Checklist"
certified product
"Certification Technical Information Sheet" "Key Parts List" "Product Certification Order Form" "Sample Lamp" "drawing"
Assembly product T2 production
Implement according to the "Quality Gate Checklist"
Material performance verification
"Test program"
Product performance testing-excluding electronic testing (DV) and rectification
"Test program"
Experiment & Test Verification (Controller Class)
"Electronic Experiment Outline" "Electronic Test Cases"
Experiment & Test Verification (Electronic)
"Electronic Experiment Outline" "Electronic Test Cases"
Part size approval
"2D Drawings"
OTS approval (parts/assembly)
"Material Test Report" "Dimensional Inspection Report" "Performance Test Report" "Appearance Approval Report"
Electronic line shifting
"Working Equipment Acceptance" "Process Route Confirmation" "Electronic Materials List" "Trial Production Personnel Training"
Assembly relocation
"Final Draft of Supervisory Work Instructions" "Final Assembly Standard Work Instructions" "Production Conditions Table Trial Production" "Exterior Quality Inspection Certificate" "Assembly Quality Inspection Certificate" "Relocation Review Checklist" "Sample Inspection Form" "Trial Production Preparation Meeting"
Development stage inspection and review
"Development Phase Checklist"
Three major documents (trial production)
"Control Plan" 《PFMEA》 "Process flow chart"
Trial production personnel training
"Loading Plan" "Personnel Training Plan"
Trial production1/2/3
"Loading Plan" "Trial Production Preparation Meeting Minutes"
Production conditions (process documents) determined
"Production Conditions Table" "Good Product Condition Inspection Report"
Appearance Approval
"Appearance Standard Book"
Trial production stage
Trial production approval
Outsourced parts packaging confirmation
"Specifications for Packaging of Outsourced Parts"
Outsourced parts PPAP approval
"PPAP" Approval
Product assembly packaging specification confirmation
"Assembly Packaging Specification"
Mold acceptance
"Mold Acceptance Report"
Tooling acceptance (assembly of tooling, surface treatment)
"Tooling Acceptance Report"
Inspection tool acceptance
"Inspection Tool Acceptance Report"
Critical process capability evaluation
"Process Characteristics List"
Volume Performance Verification (PV)
"Experimental Outline"
Customer phased audit (2TP/PPAP)
"2TP Audit Report" "PPAP Accreditation Report"
Inspection and review at trial production stage
"Trial Production Stage Checklist"
batch production stage
Product pull volume
"Batch Production Preparation Meeting"
"Product Batch Production and Volume Increase"
"Closed Loop for Improvement of Project Legacy Issues"
Client initial flow
"Client Follow-up Confirmation"
"Client-side pull volume problem tracking and resolution"
"Batch Production Handover Meeting"
"Project Summary"