MindMap Gallery Clean room laboratory construction
The flow chart clearly shows the entire process of a clean room laboratory from planning and design to construction and acceptance, helping laboratory builders!
Edited at 2024-04-02 14:12:14This Valentine's Day brand marketing handbook provides businesses with five practical models, covering everything from creating offline experiences to driving online engagement. Whether you're a shopping mall, restaurant, or online brand, you'll find a suitable strategy: each model includes clear objectives and industry-specific guidelines, helping brands transform traffic into real sales and lasting emotional connections during this romantic season.
This Valentine's Day map illustrates love through 30 romantic possibilities, from the vintage charm of "handwritten love letters" to the urban landscape of "rooftop sunsets," from the tactile experience of a "pottery workshop" to the leisurely moments of "wine tasting at a vineyard"—offering a unique sense of occasion for every couple. Whether it's cozy, experiential, or luxurious, love always finds the most fitting expression. May you all find the perfect atmosphere for your love story.
The ice hockey schedule for the Milano Cortina 2026 Winter Olympics, featuring preliminary rounds, quarterfinals, and medal matches for both men's and women's tournaments from February 5–22. All game times are listed in Eastern Standard Time (EST).
This Valentine's Day brand marketing handbook provides businesses with five practical models, covering everything from creating offline experiences to driving online engagement. Whether you're a shopping mall, restaurant, or online brand, you'll find a suitable strategy: each model includes clear objectives and industry-specific guidelines, helping brands transform traffic into real sales and lasting emotional connections during this romantic season.
This Valentine's Day map illustrates love through 30 romantic possibilities, from the vintage charm of "handwritten love letters" to the urban landscape of "rooftop sunsets," from the tactile experience of a "pottery workshop" to the leisurely moments of "wine tasting at a vineyard"—offering a unique sense of occasion for every couple. Whether it's cozy, experiential, or luxurious, love always finds the most fitting expression. May you all find the perfect atmosphere for your love story.
The ice hockey schedule for the Milano Cortina 2026 Winter Olympics, featuring preliminary rounds, quarterfinals, and medal matches for both men's and women's tournaments from February 5–22. All game times are listed in Eastern Standard Time (EST).
Clean room laboratory construction process V2.0
Project begining
Determine the safety assessment unit
Determine occupational health consulting unit
Determine the environmental impact assessment unit
Understand the environmental impact assessment policy
Evaluate project power distribution capacity and investigate and select process equipment
On-site survey to determine the design scope
Feasibility study report (if required)
Determine the design institute
Provide the first version of requirements and floor plan status
Project design kick-off meeting
process design
1. Communicate repeatedly with users to meet needs and comply with fire protection regulations, GMP regulations, and experimental animal regulations
2. Check and modify the process equipment demand table and environmental demand table
Finalized plan design
1. Confirmed and signed process equipment layout and flow chart
2. Confirmed and signed process equipment requirement list and environmental requirements
3. Confirmed renderings or color scheme
4. Confirm the wastewater and waste gas treatment plan with the environmental assessment unit
5. The safety assessment unit and environmental assessment unit provide modification opinions on the process equipment floor plan (if any)
Animal Laboratory Expert Review Meeting
P2 laboratory expert consultation meeting
Start construction drawing design
1. The original architectural drawings of the site are complete
2. The on-site conditions related to this design are clear
3. Expert review meeting for wastewater and waste gas process solutions
Determine the cost consulting unit
Final construction drawing document
1. Construction drawings comply with fire regulations and other regulations or specifications
2. The waste gas and wastewater process treatment methods need to be consistent with the environmental impact assessment report
Prepare bidding list and project control price
1. The cost consulting unit raises questions and the design institute answers them.
Determine the supervision unit (if necessary)
Construction unit bidding
1. Bidding documents
2. Cost control
3. Electronic version of construction drawings
Determine the construction unit
1. Ask questions and the design institute will answer them
2. Present drawings in person
Construction permit application
1. Construction unit information (important)
2. Construction unit information
3. Design unit information
4. Construction drawing review certificate
Full construction
1. Acceptance of concealed projects
2. Acceptance of intermediate processes
3. Depending on the needs, there may be changes to the drawings and designs.
4. Sampling and submitting important materials for inspection
5. Organize construction process documents
Construction completed
Complete the construction content according to the contract content
Fire protection completion acceptance
1. Projects that do not have third-party plan review need to go through fire protection filing procedures. If the information is complete and the project is not selected in the lottery, the fire protection filing completion document will be issued directly.
2. If you are selected by lottery, you need to make an appointment with the building owner for on-site fire inspection.
Project completion acceptance
1. After each branch’s stand-alone commissioning and self-inspection of the system without production load are passed,
2. Verification of stand-alone test runs and no-production load system test runs of each branch project, clean room (area) performance parameter testing and debugging, visual quality inspection of each branch, and qualified testing items
3. GMP and other laboratory routine testing items: temperature and humidity, cleanliness, pressure difference, illumination, and noise comply with specifications and design requirements
4. Animal laboratory: qualified third-party testing (the testing party issues a testing report)
The institute fills in the acceptance form in accordance with the GB50447 specification---Submits the acceptance review of animal experimental facilities online---Guangdong Experimental Animal Management Committee---The Experimental Animal Management Committee gives the specific date for the acceptance of animal experimental facilities (experts from the Animal Management Committee The on-site observation and review data of animal experiments are checked one by one with the site, mainly the hardware parameters of the animal facilities). Generally, if experts put forward some rectification suggestions (the rectification requirements are met within a time limit), you can obtain a license for the use of experimental animal facilities.
Project cost settlement
1. Basis for design changes
2. Basis for on-site changes
Construction project completed
1. Completion information
2. As-built drawings
The entire project is completed
Original building fire protection acceptance opinion letter
Original subject examination certificate
Note: Some nodes in this project will be skipped directly, and safety evaluation does not need to be provided.
Environmental impact assessment acceptance
Trial production and production
Review certificates (mainly fire audits)
Determine the third-party plan review unit (if necessary)
Environmental impact assessment report form (decrypted version)