MindMap Gallery Architectural Decoration Mind Map
This is a mind map about architectural decoration, which mainly includes on-site explanations of decoration projects, Indoor demolition projects and new construction projects, water and electricity renovation, waterproofing projects, carpentry projects, Ceramic tile work etc.
Edited at 2024-03-27 21:30:25This is a flowchart illustrating the process of archiving monthly failure analysis reports and tracking the implementation of improvement measures. The diagram is structured into five main steps, each with specific tasks and sub-tasks.Monthly Report Collection & Organization: This step involves collecting failure analysis reports from various departments, reviewing them for completeness, and categorizing them by product, failure mode, and severity. Root Cause Analysis & Statistics: Here, the focus is on categorizing causes, analyzing trends, identifying root causes, and compiling statistics on high-frequency failure modes and key components. Improvement Measure Formulation & Assignment: This step includes formulating improvement measures, assigning responsibilities, and setting timelines for implementation.Measure Implementation Tracking & Verification: It involves tracking the progress of implementation, verifying effectiveness, and confirming issue closure.Knowledge Base Update & Monthly Report Output: The final step covers archiving reports, updating the knowledge base, and compiling monthly summaries.This template can be easily reused and adapted using tools like EdrawMind to suit different organizational needs.
This is a timeline infographic detailing the annual product certification acquisition countdown process, structured into four sequential phases. The first phase, Certification Planning & Initiation, encompasses goal setting, timeline planning, resource preparation, defining specific certification objectives such as CCC/CE/FCC, formulating an annual plan with key milestones, and allocating necessary budget, personnel, and sample resources. Following this, the Application & Testing Phase involves material submission, coordination with certification agencies, core testing procedures, preparation of technical documents, application forms, and samples, selection of the appropriate certification agency, and execution of critical safety, EMC, and RF tests. The subsequent Rectification & Acquisition Phase focuses on addressing and rectifying any identified issues, re-verification processes, acquisition of the certificate, analysis of test issues, implementation of necessary fixes, and modification of samples for supplemental testing. Finally, the Countdown Monitoring phase emphasizes tracking progress, managing risks, monitoring remaining days and key milestones, managing time, technical, and cost risks, and maintaining effective internal and external communication throughout the process. This comprehensive template can be readily reused and adapted using tools like EdrawMind to meet diverse organizational requirements.
This is a flowchart detailing the weekly update and review plan for technical documents. The process is divided into six main stages, each with specific tasks and responsibilities. It begins with Weekly Planning, where the document scope is defined, update objectives are set, and schedules are arranged. Next, Document Updates involve maintaining various documents such as hardware design documents, test specifications, and BOM tables, alongside version control and archiving. Internal Review Preparation follows, focusing on compiling review materials, identifying participants, and setting agendas. The Review Meeting stage includes document examination, problem discussion, decision recording, and responsibility allocation. After the meeting, Review Feedback Processing takes place, involving issue tracking, document modification, quality checks, and closure verification. Finally, Output Deliverables are prepared, including official release versions, release notifications, review reports, and plans for the next week. This structured approach ensures systematic and efficient management of technical documents, and the template can be easily adapted using tools like EdrawMind.
This is a flowchart illustrating the process of archiving monthly failure analysis reports and tracking the implementation of improvement measures. The diagram is structured into five main steps, each with specific tasks and sub-tasks.Monthly Report Collection & Organization: This step involves collecting failure analysis reports from various departments, reviewing them for completeness, and categorizing them by product, failure mode, and severity. Root Cause Analysis & Statistics: Here, the focus is on categorizing causes, analyzing trends, identifying root causes, and compiling statistics on high-frequency failure modes and key components. Improvement Measure Formulation & Assignment: This step includes formulating improvement measures, assigning responsibilities, and setting timelines for implementation.Measure Implementation Tracking & Verification: It involves tracking the progress of implementation, verifying effectiveness, and confirming issue closure.Knowledge Base Update & Monthly Report Output: The final step covers archiving reports, updating the knowledge base, and compiling monthly summaries.This template can be easily reused and adapted using tools like EdrawMind to suit different organizational needs.
This is a timeline infographic detailing the annual product certification acquisition countdown process, structured into four sequential phases. The first phase, Certification Planning & Initiation, encompasses goal setting, timeline planning, resource preparation, defining specific certification objectives such as CCC/CE/FCC, formulating an annual plan with key milestones, and allocating necessary budget, personnel, and sample resources. Following this, the Application & Testing Phase involves material submission, coordination with certification agencies, core testing procedures, preparation of technical documents, application forms, and samples, selection of the appropriate certification agency, and execution of critical safety, EMC, and RF tests. The subsequent Rectification & Acquisition Phase focuses on addressing and rectifying any identified issues, re-verification processes, acquisition of the certificate, analysis of test issues, implementation of necessary fixes, and modification of samples for supplemental testing. Finally, the Countdown Monitoring phase emphasizes tracking progress, managing risks, monitoring remaining days and key milestones, managing time, technical, and cost risks, and maintaining effective internal and external communication throughout the process. This comprehensive template can be readily reused and adapted using tools like EdrawMind to meet diverse organizational requirements.
This is a flowchart detailing the weekly update and review plan for technical documents. The process is divided into six main stages, each with specific tasks and responsibilities. It begins with Weekly Planning, where the document scope is defined, update objectives are set, and schedules are arranged. Next, Document Updates involve maintaining various documents such as hardware design documents, test specifications, and BOM tables, alongside version control and archiving. Internal Review Preparation follows, focusing on compiling review materials, identifying participants, and setting agendas. The Review Meeting stage includes document examination, problem discussion, decision recording, and responsibility allocation. After the meeting, Review Feedback Processing takes place, involving issue tracking, document modification, quality checks, and closure verification. Finally, Output Deliverables are prepared, including official release versions, release notifications, review reports, and plans for the next week. This structured approach ensures systematic and efficient management of technical documents, and the template can be easily adapted using tools like EdrawMind.
Building decoration construction and material testing
Decoration project on-site explanation
content
designer
Project designer
Description of overall project implementation and design details
Construction manager foreman
Project construction party
A. Acceptance drawings
Floor plans, elevations, node diagrams, etc.
B. Check the site
1. Is the water supply connected?
2. Is strong power connected?
3. Sewer pipes are clear
4. Is the roof flat?
5. Is the wall vertical?
6. Floor flatness and presence of cracks
C. Go through construction procedures
1. Provide design drawings
2. Sign a construction contract with the property owner
3. Apply for construction permit
4. Apply for a pass
5. Delivery related costs
D. indoor payout
horizontal line
E. Site protection
stairs
original build
Public area
basement access
Indoor and outdoor floor protection
owner
Party A
supervision
Usually a third party
Communicate and annotate through drawings
time
1. Within three days to one week before the start of the project
Place
1. Construction Site
Interior demolition and new construction
indoor demolition project
Preparations before dismantling
The project price must be negotiated
demolition costs
Garbage removal freight
Understand construction drawings
Understand the wall removal diagram in the floor system diagram
Precautions
Determine the location of load-bearing walls in drawings and in actual projects
Determine the location of indoor pipes
Fire pipe
gas pipe
flue
If disassembly or modification is required, professionals will be required to perform it.
water pipes
Determine load-bearing columns and structural beams
General home improvement projects are not allowed to be dismantled or modified.
Removal size positioning
Wall removal positioning
Original residential wall removal
tear down
Removal of original interior wall coverings
spray water
Special blade for surface treatment
The acceptance criteria is that all walls have been removed cleanly
Indoor structure demolition
Precautions
cut off water supply
Be careful to avoid hidden circuits
Do not remove the balcony counterweight walls of prefabricated houses built before 1995
The original lighting fixtures must be dismantled first
After the floor tiles are removed, the cement paving surface must be cleaned. Otherwise it will affect the secondary paving.
Bedroom door opening needs to be treated with lintel
Pay attention to the protection of upper and lower water pipes to prevent gravel from falling into the pipes
The opening in the brick wall is less than 1 meter wide
Remove the broken paint
Cement mortar for cross-section painting
Rough work is not allowed
Garbage removal
indoor new construction
Reading and positioning house construction drawings
basic processing
Layout positioning
build wall
Material
brick
red brick wall
block wall
cement mortar
acceptance
Wall verticality
Is the light receiving surface of the yin and yang angle vertical?
Precautions
Wall bolts must be used when combining new and old walls
Excessive addition of door opening in red brick wall
The centipede wall was built two days apart
Plastering
Material
cement mortar
construction
Precautions
lighten
Hydropower transformation
Drawing analysis
Lamp positioning diagram
Specific placement and type of lamps
Lamp wiring diagram
Switch distribution position and control method
Electromechanical point map
Socket and network cable layout location
Hydropower renovation project
waterway construction
Sheung Shui
Main material
ppr pipe (φ20-32㎜*4m)
hot melt bonding
construction
Elastic line positioning
Grooving
Threading and ducting
Sealing groove
Precautions
subtopic
launch
Main material
pvc pipe
pvc special glue
construction
position
Through pipe connection
Handle connection closures
circuit construction
strong electricity
Material
pvc pipe
Copper core 1.5 square meters, 2.5 square meters wires, etc.
construction
Elastic line positioning
Grooving
Threading and buried pipe
Fixed sealing trough
Weak current
Material
construction
Heating construction
Ordinary heating
Heating pipes
Features
cost
Heating radiator
Main pipe use (φ40㎜ ppr pipe)
Floor heating construction
Trap
controller
backfill layer
Floor heating coil
Reflective film
insulation cotton
Base layer treatment (floor layer)
Central air conditioning
Including floor heating part
On-site cleaning
waterproofing project
Bathroom waterproof
Precautions for painting
Pipe joints need to be plugged
It is necessary to seal the line pipe before waterproofing construction
Painting height
The general painting height is 300 mm
Shower section 1800mm
The wash basin part exceeds 500 mm
Painting process
Basic treatment
Seal pipe gaps
Apply base paint
Wait for the surface layer to dry and then do the closed water test for 24 hours.
Keep good records and coordinate with property management, supervision, and construction personnel
kitchen waterproof
Precautions
Seal pipelines before waterproofing construction
The intersection between pipes and floor slabs should be treated with water so that they do not leak.
Painting height
The dry kitchen is generally turned up 300mm around, and the water part is turned up 1200mm.
If the wall-mounted gas water heater must exceed the water supply height by 300 mm
Painting process
Basic treatment
Seal pipe gaps
Apply base paint
Wait for the surface layer to dry and then do the closed water test for 24 hours.
Keep good records and coordinate with property management, supervision, and construction personnel
Other waterproof
roof
basement
Tile project
drawing
Precautions
How to budget for ceramic tile area
Quality inspection of floor and wall tiles
Is the paving smooth?
Is the yin and yang angle vertical?
Is there any hollowing phenomenon?
Ceramic tile main material
glazed tiles
Ceramic glazed tiles (strong water absorption)
Porcelain glazed tiles (weak water absorption)
How to distinguish two types of bricks
Vitrified brick (a type of full-body brick)
Microcrystalline stone (ceramic glass has high brightness)
Antique bricks (commonly used in style decoration)
Mosaic (ceramic tiles)
Ceramic tile accessories
cement
Dasha
Tile adhesive
Ceramic tile grout
Caulk
construction tools
Construction technology
Basic treatment
Elastic line positioning
Prepare mortar
paving tiles
Caulking (beautiful seams)
carpentry engineering
1. Ceiling project
Light steel keel ceiling
drawing
Craftsmanship
wooden keel ceiling
Aluminum gusset ceiling
glass ceiling
Soft film ceiling
wooden suspended ceiling
plastic grille ceiling
Aluminum grille ceiling
Aluminum plastic plate ceiling
Mineral wool board ceiling
GRG suspended ceiling
Partition wall project
Other woodwork
How to make and design indoor cabinets
construction materials
solid wood
Mainly antique furniture
Ming and Qing Furniture
Plate type
particle board
Eco board
Melamine board
finger joint board
density board
board wood combination
The partitions are ecological boards or finger-jointed boards
Construction technology and methods
production on spot
Factory customization
design method
General home wardrobe and cabinet design methods
Wardrobe
cupboard
Interior painting and painting projects
wall paint construction
Material
Craftsmanship
wood paint
Material
Craftsmanship
Indoor installation project
Lighting installation
Wood floor installation
Door cabinet installation
Bathroom installation