MindMap Gallery PMP-Cost Management
PMP cost management chapter key knowledge, test points summary, it is recommended to collect and download ~ detailed summary of planning cost management, estimating costs, formulating budgets, and controlling costs.
Edited at 2023-03-12 22:14:11This is a mind map about bacteria, and its main contents include: overview, morphology, types, structure, reproduction, distribution, application, and expansion. The summary is comprehensive and meticulous, suitable as review materials.
This is a mind map about plant asexual reproduction, and its main contents include: concept, spore reproduction, vegetative reproduction, tissue culture, and buds. The summary is comprehensive and meticulous, suitable as review materials.
This is a mind map about the reproductive development of animals, and its main contents include: insects, frogs, birds, sexual reproduction, and asexual reproduction. The summary is comprehensive and meticulous, suitable as review materials.
This is a mind map about bacteria, and its main contents include: overview, morphology, types, structure, reproduction, distribution, application, and expansion. The summary is comprehensive and meticulous, suitable as review materials.
This is a mind map about plant asexual reproduction, and its main contents include: concept, spore reproduction, vegetative reproduction, tissue culture, and buds. The summary is comprehensive and meticulous, suitable as review materials.
This is a mind map about the reproductive development of animals, and its main contents include: insects, frogs, birds, sexual reproduction, and asexual reproduction. The summary is comprehensive and meticulous, suitable as review materials.
PMP-Cost Management
planning cost management
cost management plan
unit of measurement
Accuracy
Accuracy
Organization Program Links
control threshold
performance measurement rules
report format
Other details
Estimate cost
Estimate
analogy estimation
parameter estimation
top-down estimation
three point estimate
beta distribution
cE=(cO 4cM cP)/6
triangular distribution
cE=(cO cM cP)/3
data analysis
Alternatives Analysis
Reserve analysis
contingency reserve
Address known risks
included in cost baseline
management reserve
Dealing with unknown risks
quality cost
consistency cost
prevention cost
Evaluate costs
cost of inconsistency
internal failure costs
external failure costs
Budgeting
cost basis
Project funding requirements
Control costs
Earned value management
Earned value analysis
PV
planned value
EV
earned value
AC
actual cost
BAC
completion budget
Deviation analysis
SV
progress deviation
SV=EV-PV
CV
cost deviation
CV=EV-AC
SPI
progress performance indicators
SPI=EV/PV
CPI
cost performance indicators
CPI=EV/AC
VAC
Completion Variance
VAC=BAC-EAC
trend analysis
EAC
Completion Estimate
EAC=BAC/CPI
EAC=AC BAC-EV
EAC=AC (BAC-EV)/CPI*SPI
EAC=ETC AC
ETC
Completion needs to be estimated
ETC=EAC-AC
ETC = bottom-up estimation
TCPI
Performance indicators required for completion
TCPI=(BAC-EV)/(BAC-AC)
TCPI=(BAC-EV)/(EAC-AC)