MindMap Gallery BIM three-dimensional site layout solution review
A mind map of BIM three-dimensional site layout solutions, including deepening goals, Detailed process - 3D field layout modeling process, detailed checklist, etc.
Edited at 2024-03-12 20:20:33This is a mind map about bacteria, and its main contents include: overview, morphology, types, structure, reproduction, distribution, application, and expansion. The summary is comprehensive and meticulous, suitable as review materials.
This is a mind map about plant asexual reproduction, and its main contents include: concept, spore reproduction, vegetative reproduction, tissue culture, and buds. The summary is comprehensive and meticulous, suitable as review materials.
This is a mind map about the reproductive development of animals, and its main contents include: insects, frogs, birds, sexual reproduction, and asexual reproduction. The summary is comprehensive and meticulous, suitable as review materials.
This is a mind map about bacteria, and its main contents include: overview, morphology, types, structure, reproduction, distribution, application, and expansion. The summary is comprehensive and meticulous, suitable as review materials.
This is a mind map about plant asexual reproduction, and its main contents include: concept, spore reproduction, vegetative reproduction, tissue culture, and buds. The summary is comprehensive and meticulous, suitable as review materials.
This is a mind map about the reproductive development of animals, and its main contents include: insects, frogs, birds, sexual reproduction, and asexual reproduction. The summary is comprehensive and meticulous, suitable as review materials.
deepen goals
Use BIM technology to conduct forward site design and construction Model, through the review of three-dimensional models, to optimize the layout of the site, for some complex Use general component nodes to carry out model deepening and optimization, and output detailed drawings and 3D Renderings to guide the site layout of the project site and improve the rationality of the site layout and site utilization.
Optimize site layout through analysis, issue site layout components and material details order, reduce temporary changes, reduce on-site safety risks, and improve project facilities. efficiency and quality to achieve the purpose of reducing costs and increasing efficiency.
Deepening process-3D field layout modeling process
Drawing collection
One month before the appearance
Collect electronic drawings, including general building plans, foundation pit enclosure plans, Architectural structural drawings, preliminary site layout drawings, etc.
Application briefing
Half a month before project entry
BIM engineers provide a comprehensive explanation of relevant work to the project department before the project department carries out technical planning.
Field layout modeling at each stage
Half a month before project entry
The project department is responsible for the construction of the earthwork stage, main stage, and decoration stage. The ground layout is modeled, and each level can be modeled according to the characteristics of each project. The segments are further subdivided.
Model deepening and optimization
10 days before project entry
According to CIS standards, the BIM engineer is responsible for the coordination, and the on-site project technology is responsible for the cooperation. The model is adjusted and optimized according to the characteristics and difficulties of the project, such as construction roads, safety protection, tower crane layout, living facilities and dormitory layout, etc.
Result disclosure
Within 3 days before project entry
The BIM engineer led the project technical leader to organize a review and presentation meeting on various results of the three-dimensional field layout.
Implement process checks
Depends on project progress
Check the implementation during the implementation process and understand the problems and difficulties encountered during the implementation.
Summary and improvement
After the completion of each stage of the process
Based on the actual effects of the site layout, the problems encountered during the layout and the proposed solutions, a summary was made, and at the same time the three-dimensional site layout guide manual was optimized and improved accordingly.
Assessment and evaluation
After completion of each phase of the project
The Technical Department conducts a comprehensive evaluation of each execution process, and the evaluation results reflect the performance of each responsible person
Deepen the list
Overall layout of construction site
Site walls, gates and guards
Eight cards and two pictures, positioning of the flag altar
Container style tea kiosk and smoking room
Sample display area
Standard breeding room
Distribution room
Various guide signs
On-site construction roads and pedestrian and vehicle diversion
Commentary desk before class
On-site fire protection facilities
On-site power supply layout
foundation pit stage
support maintenance
Earth moving ramps, construction trestles
Car wash tank and scale positioning selection
Foundation pit pedestrian passage
main stage
proposed building
Tower crane positioning selection
Positioning of people and freight elevators
Foundation and protection of people and freight elevators and tower cranes
On-site processing sites and processing sheds
Exit
Workspace
Office building selection and positioning and facade look and feel practices
Office area landscaping
Parking space layout
Fences and gates
On-site roads
Living Area
Selection and arrangement of migrant workers’ dormitories
Kitchen and dining room
Toilets and bathrooms
Washing and clothes drying area
Sports facilities
Non-motorized vehicle parking spots
parking space
In-depth design application of measures - BIM three-dimensional site layout