The preparation of project pricing quotas includes budget quotas, budget quotas, budget indicators, and the preparation of estimation indicators. The budget quotas are based on the budget quotas to determine the labor and materials required to complete qualified unit expansion sub-projects or unit expansion structural components. , quantity standards and cost standards for mechanical shifts.
Edited at 2023-07-30 11:15:09This is a mind map about bacteria, and its main contents include: overview, morphology, types, structure, reproduction, distribution, application, and expansion. The summary is comprehensive and meticulous, suitable as review materials.
This is a mind map about plant asexual reproduction, and its main contents include: concept, spore reproduction, vegetative reproduction, tissue culture, and buds. The summary is comprehensive and meticulous, suitable as review materials.
This is a mind map about the reproductive development of animals, and its main contents include: insects, frogs, birds, sexual reproduction, and asexual reproduction. The summary is comprehensive and meticulous, suitable as review materials.
This is a mind map about bacteria, and its main contents include: overview, morphology, types, structure, reproduction, distribution, application, and expansion. The summary is comprehensive and meticulous, suitable as review materials.
This is a mind map about plant asexual reproduction, and its main contents include: concept, spore reproduction, vegetative reproduction, tissue culture, and buds. The summary is comprehensive and meticulous, suitable as review materials.
This is a mind map about the reproductive development of animals, and its main contents include: insects, frogs, birds, sexual reproduction, and asexual reproduction. The summary is comprehensive and meticulous, suitable as review materials.
Preparation of project pricing quotas
budget quota
Preparation method
Man-day consumption
Basic labor = Σ (comprehensive project quantity × time quota)
Other employment
Over-hauling distance labor = Σ (over-hauling distance material quantity × time quota)
Auxiliary labor Σ (material processing quantity × corresponding processing labor quota)
Labor amplitude difference = (basic labor, auxiliary labor, over-distance labor) × labor amplitude difference coefficient
Artificial amplitude difference content
1. The overlapping and cross-working processes between various types of work cooperate with each other or affect the stoppage and employment of locks.
2. During the construction process, the moving of temporary water and electricity lines will affect workers’ operating time.
3. Project quality inspection and hidden project acceptance work affect the time of manual operation
4. The transfer of operation locations between unit projects within the same site affects the time of workers’ operations.
5. Unavoidable trimming work on the previous process during process handover
6. Other unavoidable sporadic labor during construction
Material consumption
Material consumption = net material usage × (1 loss rate %)
Mechanical shift consumption
Budgeted quota of machinery consumption per shift = construction quota of machinery consumption per shift × (1 mechanical amplitude difference coefficient)
Budget quota
It is based on the budget quota to determine the quantity standards and cost standards for labor, materials, and mechanical shifts required to complete qualified unit expansion sub-projects or unit expansion structural components.
Differences from the budget quota - project division and comprehensive expansion degree
Proposed budget indicators
Consumption standards and cost indicators for labor, materials, and machinery shifts are usually stipulated based on unit projects, with building area, volume, or shifts or groups of complete sets of equipment and equipment as units of measurement.
Determine the consumption indicator objects are different
Estimated budget quota - unit expansion of sub-projects or unit expansion of structural components
Budgetary Indicators - Unit Project
Determine indicator consumption based on different
Estimated budget quota - based on budget quota
Estimated budget indicators - prepared based on completed project data
Investment estimation indicators
Comprehensive indicators of construction projects
The total investment amount included in the total project investment from project establishment to completion acceptance and delivery for use
Single project investment
Other construction costs
reserve fee
Individual project indicators
The total amount of investment in a single project that can independently exert production capacity or use efficiency
Project costs
Other fees that may be included
Unit engineering index
The cost of engineering projects that can be designed and constructed independently
Construction and installation engineering fees