First-level Cost Engineer Engineering Pricing Chapter 3, Sections 2 and 3, Design Estimates and Construction Drawing Budget Preparation, comprehensive knowledge, I hope it will be helpful to interested friends!
Edited at 2024-01-22 16:27:20This is a mind map about bacteria, and its main contents include: overview, morphology, types, structure, reproduction, distribution, application, and expansion. The summary is comprehensive and meticulous, suitable as review materials.
This is a mind map about plant asexual reproduction, and its main contents include: concept, spore reproduction, vegetative reproduction, tissue culture, and buds. The summary is comprehensive and meticulous, suitable as review materials.
This is a mind map about the reproductive development of animals, and its main contents include: insects, frogs, birds, sexual reproduction, and asexual reproduction. The summary is comprehensive and meticulous, suitable as review materials.
This is a mind map about bacteria, and its main contents include: overview, morphology, types, structure, reproduction, distribution, application, and expansion. The summary is comprehensive and meticulous, suitable as review materials.
This is a mind map about plant asexual reproduction, and its main contents include: concept, spore reproduction, vegetative reproduction, tissue culture, and buds. The summary is comprehensive and meticulous, suitable as review materials.
This is a mind map about the reproductive development of animals, and its main contents include: insects, frogs, birds, sexual reproduction, and asexual reproduction. The summary is comprehensive and meticulous, suitable as review materials.
Chapter 3 Section 2 and 3 Design Budget and Construction Drawing Budget Preparation
Section 2 Preparation of Design Budget
Main factors affecting project cost during the design stage
Main factors affecting the cost of industrial construction projects
General graphic design
site conditions
Covered area
Functional Division
Transportation method
technological design
Construction scale, standards and product plans;
Selection of process flow and main equipment;
Supply of main raw materials and fuel;
Production organization and labor quota in the production process;
"Three wastes" management and environmental protection measures, etc.
architectural design
Plane shape
Generally speaking, the simpler the building's plan shape, the lower the cost per unit area. The design of the building's plane shape should reduce the building perimeter coefficient on the premise of meeting the building's use functions. Generally, the lower the building perimeter coefficient, the more economical the design.
circulation space
On the premise of meeting the building use requirements, circulation space should be reduced to a minimum
space combination
Floor height: The building area remains unchanged, increasing the floor height increases the cost.
Number of floors: If the structural form remains unchanged, increasing the number of floors will reduce the cost. If the structural form changes, the unit cost will increase.
Indoor and outdoor height difference: If the height difference is too large, it will increase the cost; if the height difference is too small, it will affect the use and hygiene requirements.
Volume and area of buildings: the size increases and the cost per unit area decreases
building structure:
Buildings with five floors or less generally use masonry structure;
For large and medium-sized industrial plants, reinforced concrete structures are generally used;
For multi-story houses or long-span buildings, choose steel structures;
For high-rise or super-high-rise buildings, frame structures and shear wall structures are more economical
Column grid layout: For single-span factory buildings, when the column spacing remains unchanged, the larger the span, the lower the cost per unit area; for multi-span factory buildings, when the span remains constant, the greater the number of mid-spans, the more economical it is.
Building volume and area
building structure
Column grid layout
Material selection
Equipment selection
Main factors affecting the cost of civil construction projects
Main factors affecting project cost in residential community construction planning
The core issue in community planning and design is to improve land utilization
Land is saved by adopting methods such as high-low matching, combination of dots and strips, staggered arrangement front and back, partial east-west arrangement, diagonal arrangement or corner units.
On the premise of ensuring the residential function of the community, appropriately centralizing public facilities, increasing the number of floors of public buildings, rationally arranging roads, and making full use of corner land in the community will help increase building density and reduce the total cost of the community.
Save land by reasonably compressing the spacing between buildings, appropriately increasing the number of residential floors or matching high-rise and low-rise buildings, and appropriately increasing the length of houses.
Main factors affecting project cost in civil residential building design
In rectangular residential buildings, length:width = 2:1 is preferred; Generally, residential units consist of 3 to 4 residential units; A house length of 60~80m is more economical; Appropriately increasing the width of the residence will help reduce the construction cost; As the number of residential floors increases, the unit cost coefficient gradually decreases, but the marginal cost coefficient also gradually decreases; The index to measure unit composition and house type design is the structural area coefficient (the ratio of residential structural area to building area). The smaller the coefficient, the more economical the design plan will be.
Other factors affecting project cost
Knowledge level of design units and designers
Interest demands of project stakeholders
risk factors
The concept of design budget and its preparation content
Static investment serves as the basis for evaluating and selecting design solutions;
Dynamic investment serves as a limit for project financing, supply, and control over the use of funds.
Level three budget estimates
The unit project budget estimate is The most basic calculation file
Construction project budget estimate
Equipment and installation project budget estimates
Comprehensive budget estimate for a single project: compiled by summarizing the project budget estimates for each unit in a single project
Construction project total budget estimate
The comprehensive budget estimates for each individual project, other project construction cost estimates, reserve fees, interest during the construction period and preliminary working capital estimates are compiled and compiled.
Preparation of design budget
Preparation of unit project budget estimates
Construction project budget estimate
Budgetary quota method: also known as the expanded unit price method and the expanded structure quota method, which requires that the preliminary design must reach a certain depth
Estimated budget indicator method: When the design has no detailed drawings but only a conceptual design, or the preliminary design is not deep enough, there are similar project budget indicators that can be used, and there is an urgent need to determine the cost.
Similar project budget method
Equipment and installation project budget estimates
Budget unit price method: When the preliminary design is deep and there is a detailed equipment list
Expanded unit price method: When the preliminary design depth is not enough, the equipment list is incomplete, and there is only the main equipment or the weight of the complete set of equipment.
Equipment value percentage method: When the preliminary design depth is not enough and there is only the ex-factory price of the equipment without detailed specifications and weight, the installation fee can be calculated as a percentage of the equipment cost.
Comprehensive tonnage index method: When the equipment list provided by the preliminary design has specifications and equipment weight (the equipment list is complete). This method is often used to estimate the installation project budget for non-standard equipment and imported equipment where equipment prices fluctuate greatly.
Preparation of individual project budget estimates
Construction project total budget estimate
It is composed of comprehensive budget estimates for each individual project, other project construction costs, interest during the construction period, reserve fees and preliminary working capital estimates for operating projects, and is prepared in accordance with the unified form prescribed by the competent department.
Section 3 Preparation of Construction Drawing Budget
The meaning of construction drawing budget
The construction drawing budget can be the plan or expected price calculated based on the construction drawings and in accordance with the budget quota, fee standards, various project pricing information, etc. before or during the project bidding;
It can also be the actual budget price calculated by the construction enterprise after winning the project bid based on its own enterprise quota, resource market price, market supply and demand, and competition conditions.
The role of construction drawing budget
Effect on investors
1) The construction drawing budget is an important link in controlling the project cost during the design stage, and is an important measure to control the construction drawing design so as not to exceed the design estimate.
2) Construction drawing budget is the basis for cost control and rational use of funds.
3) The construction drawing budget is the basis for determining the maximum bid limit for the project.
4) The construction drawing budget can be used as the basis for determining the contract price, allocating project progress payments and handling project settlement.
Effect on construction companies
1) The construction drawing budget is the basis for the construction company’s bidding quotation.
2) The construction drawing budget is the basis for the construction project budget and the main content of the construction contract.
3) The construction drawing budget is the basis for the construction enterprise to arrange and allocate construction forces and organize the supply of materials.
4) The construction drawing budget is the basis for construction companies to control project costs.
Preparation of construction drawing budget
Preparation of unit project construction drawing budget
physical quantity method Consumption quota × actual unit price
Direct cost per unit project = Comprehensive man-day consumption x Comprehensive man-day unit price ∑ (Consumption of various materials x Corresponding unit price of materials) ∑ (Consumption of various construction machinery x unit price of corresponding construction machinery shift) ∑ (Consumption of various construction instruments x unit price of corresponding construction instrument shift) (3. 3.1) Unit project budget cost = unit project direct cost, enterprise management fee, profit, regulatory fee, tax
unit price method for work and materials Unit valuation table or fixed base price × price adjustment coefficient or index
Unit project budget cost = (∑ Sub-project quantity x Sub-project unit price of materials) Corporate management fees, profits, fees, taxes
Preparation of comprehensive budget for individual projects
Preparation of total budget for construction projects
Please refer to Chapter 1 for the specific preparation method of other project construction expenses, reserve funds, interest during the construction period and preliminary working capital. related information. Taking the time when the construction drawing budget of the construction project is prepared as the boundary, if the above expenses have already been incurred, they will be listed at the reasonable amount incurred. If they have not yet been incurred, they will be calculated and included according to the original budget content and the billing principles of this stage.