MindMap Gallery Construction process
Including demolition, new wall construction, 3. water, electricity, heating and air conditioning renovation construction, 4. waterproofing engineering construction, 5. brick paving engineering construction, 6. carpentry engineering construction, 7. putty engineering construction, etc.
Edited at 2024-11-21 08:33:58This template shows the structure and function of the reproductive system in the form of a mind map. It introduces the various components of the internal and external genitals, and sorts out the knowledge clearly to help you become familiar with the key points of knowledge.
This is a mind map about the interpretation and summary of the relationship field e-book, Main content: Overview of the essence interpretation and overview of the relationship field e-book. "Relationship field" refers to the complex interpersonal network in which an individual influences others through specific behaviors and attitudes.
This is a mind map about accounting books and accounting records. The main contents include: the focus of this chapter, reflecting the business results process of the enterprise, the loan and credit accounting method, and the original book of the person.
This template shows the structure and function of the reproductive system in the form of a mind map. It introduces the various components of the internal and external genitals, and sorts out the knowledge clearly to help you become familiar with the key points of knowledge.
This is a mind map about the interpretation and summary of the relationship field e-book, Main content: Overview of the essence interpretation and overview of the relationship field e-book. "Relationship field" refers to the complex interpersonal network in which an individual influences others through specific behaviors and attitudes.
This is a mind map about accounting books and accounting records. The main contents include: the focus of this chapter, reflecting the business results process of the enterprise, the loan and credit accounting method, and the original book of the person.
Construction process
2. Demolition and new wall construction
Designers, project managers, owners, and construction personnel go to the site
The designer draws the location for demolishing the wall
Demolition construction
The designer draws out the location of the wall demolition on site based on the drawings
On-site construction workers
On-site construction workers will stretch the lines according to the position drawn by the designer.
On-site construction workers must cut off according to the position of the elastic line. The depth of the wall to be demolished must be 2~3cm.
On-site construction workers must use boards to protect the ground to avoid damaging the floor heating pipes.
After dismantling, the garbage must be bagged and stacked neatly and transported to the designated garbage dumping place.
wall construction
The designer will release the location of the wall to be built on site based on the drawings
On-site construction workers
On-site construction workers will stretch the lines according to the position drawn by the designer.
On-site construction workers must lift vertical wires according to the position of the elastic wires
If there is a door opening, 4*4 angle steel must be used for the lintel, and the angle steel shall not be less than 20cm deep into the wall.
The top row of bricks must be placed diagonally
If you need to build aerated block wall tiles, small red bricks should be used as the base for kitchen and bathroom walls less than 30 cm.
After the wall is built, it must be flat and the vertical error cannot exceed 1cm.
All sewer pipes must be wrapped with soundproof cotton
Except for laying bricks on the walls, all other walls should be painted and the walls and floors should be solid.
Project manager design and acceptance in advance
If the acceptance standards are met, the owner and designer will be notified for acceptance.
Notify the owner to carry out acceptance inspection and proceed with the next project.
If the acceptance fails, workers will be notified to rework.
If the acceptance fails, workers will be notified to rework.
3. Water, electricity, heating and air conditioning renovation construction
Designers, project managers, owners, and construction personnel go to the site
Designers locate water, electricity, and air conditioning according to construction drawings
The designer took photos of the waterway and circuit walk and kept them for the record
On-site construction workers
Air conditioning installation
Water and electricity are grooved according to the positioning, and the grooves must be vertical.
The low box must be installed squarely
The waterway must be suppressed after it is completed
project manager
Cooperate with workers to load materials and lay auxiliary materials
Daily patrol
Inspection and acceptance
4. Waterproof project construction
Bricklaying underlayment
construction workers
Keep the construction area clean and level
The floor of the kitchen balcony is completely made, and the wall is 30cm away from the floor with composite membrane.
The bathroom floor is completely covered and the wall is 180cm away from the floor with composite membrane.
Paint the floor with Oriental Yuhong or Sika paint
There should be no hollow drums where the composite membrane is made.
After the paint and membrane are completely dry, do a 24-hour closed water test.
Designers, project managers, owners, and construction personnel go to the site for acceptance. Acceptance must be signed to confirm.
5. Brick paving project construction
Designers, project managers, owners, and construction personnel go to the site
designer
Designers explain to construction workers based on construction drawings
Designers often visit
On-site construction workers
The paving must be based on the one-meter line and the overall elevation.
All tiles must be jointed
The hollow rate of wall and floor tiles cannot exceed 95%
The yin and yang corners of the ceramic tiles must be vertical
Tiles that need to be cut in the shape of "7" must be cut on site and cannot be cut on both sides.
project manager
Cooperate with workers to load materials and lay auxiliary materials
Daily patrol
Inspection and acceptance
6. Carpentry engineering construction
Designers, project managers, owners, and construction personnel go to the site
designer
Designers explain to construction workers based on construction drawings
Designer’s daily tour
On-site construction workers
Release the construction line that needs to be constructed according to the one-meter line
All ceiling corners are covered with "L" shaped gypsum boards
Materials: light steel keel, partial wooden keel
The base of the wall must be perpendicular to the horizontal ruler
project manager
Cooperate with workers to load materials and lay auxiliary materials
Daily patrol
Inspection and acceptance
7. Putty project construction
designer
Designers explain to construction workers based on construction drawings
Designer’s daily tour
On-site construction workers
Apply anti-rust paint
Use mesh and fine cloth to deal with gaps
Overall leveling with plaster
Doors, windows, baseboards, wardrobes and other places are all leveled with hanging bars.
Yin and Yang corners need to use Yang corner strips
project manager
Cooperate with workers to load materials and lay auxiliary materials
Daily patrol
Inspection and acceptance
8. Finished product installation project
designer
Connect with the corresponding construction personnel according to the drawings
Designer’s daily tour
On-site construction workers
Door installation
Cabinet installation
wall covering
Bathroom installation
Lighting installation
project manager
Finished product protection
Daily patrol
Inspection and acceptance
9. Delivery and acceptance
On-site acceptance by project manager and designer
Owner, project manager, design site acceptance
Taking photos with the owner at his home