Continue Site and Structural Research toAvoid Costly Complications. May NeedFull Survey to Determine Addition Sizeand Setback. Also if Building on Slope orSensitive Areas a Geotech May BeRequired for City Approval.
Client
Visit Showrooms
Refine Fixture & Appliance typesand Sizes
Project Developer
Track Progress and Costs
1st Design Review
Designer
Presents Design Option Plans and 3DWalkthrough.
Structure Integration and Building DepartmentRequirements Discussed.
Client
Refines Preferences
Project Developer
Structural Integration Alternates Discussed
Budget Targets Reviewed
Process
Designer
Develops Measured Drawings / Asbuilts
Develops Design Options
Preliminary Building Department Red FlagsConsidered.