MindMap Gallery 1A43000 related regulations and technical standards
Construction practice: Relevant regulations and technical standards, including regulations related to construction projects, construction safety production and construction site management regulations, etc.
Edited at 2024-01-17 10:27:20This is a mind map about bacteria, and its main contents include: overview, morphology, types, structure, reproduction, distribution, application, and expansion. The summary is comprehensive and meticulous, suitable as review materials.
This is a mind map about plant asexual reproduction, and its main contents include: concept, spore reproduction, vegetative reproduction, tissue culture, and buds. The summary is comprehensive and meticulous, suitable as review materials.
This is a mind map about the reproductive development of animals, and its main contents include: insects, frogs, birds, sexual reproduction, and asexual reproduction. The summary is comprehensive and meticulous, suitable as review materials.
This is a mind map about bacteria, and its main contents include: overview, morphology, types, structure, reproduction, distribution, application, and expansion. The summary is comprehensive and meticulous, suitable as review materials.
This is a mind map about plant asexual reproduction, and its main contents include: concept, spore reproduction, vegetative reproduction, tissue culture, and buds. The summary is comprehensive and meticulous, suitable as review materials.
This is a mind map about the reproductive development of animals, and its main contents include: insects, frogs, birds, sexual reproduction, and asexual reproduction. The summary is comprehensive and meticulous, suitable as review materials.
Regulations and standards related to construction projects
regulations
Regulations related to construction projects
Regulations on the management of urban roads, underground pipelines and construction projects
No excavation is allowed within 5 years of newly built, expanded or reconstructed urban roads and within 3 years of overhauled urban roads.
Management regulations for urban construction archives
Archival materials for key management of urban construction archives
two sets of information
a set of construction units
One set transferred to the Urban Construction Archives
Electronic files and paper files are transferred together
Information requirements
Complete information must be submitted within 3 months, and incomplete information must be supplemented within 3 months.
Construction is suspended or postponed, and the construction unit shall keep it
Archive originals
Regulations related to construction safety production and construction site management 11, 0, 6, 0, 2
Relevant Provisions on Handling Production Safety Accidents in Engineering Construction
Relevant Provisions on Handling Safety Accidents
Report to the person in charge of the unit
Report to the production safety supervision and management department at or above the county level where the accident occurred within 1 hour
Timely supplementary reporting of changes in the number of deaths within 30 days
If on-site objects need to be moved, draw a simplified diagram of the site and make a written report, and properly preserve important traces and evidence of the site.
Safety incident reporting requirements
Report to the State Council if it is extremely serious or serious
Larger: Work safety supervision and administration departments of the people's governments of provinces, autonomous regions, and municipalities directly under the Central Government
General: Report to the production safety supervision and administration department of the people's government of the districted municipality
Report the incident
Overview of the unit where the accident occurred
The time and place of the accident and the circumstances of the accident scene
Brief history of the accident
Casualties and preliminary estimated direct economic losses caused or likely to be caused
measures already taken
Other content that should be reported
summary
Accident investigation report contents
Overview of the unit where the accident occurred
The incident and rescue situation
Casualties and direct economic losses caused by the accident
Cause of the accident and nature of the accident
Identification of accident liability and suggestions for handling those responsible for the accident
Accident prevention and corrective measures
summary
accident investigation
The corresponding unit investigates or authorizes the relevant department to organize an accident investigation team to investigate.
Accident investigation team participating departments
Relevant people's governments, production safety supervision and management departments, relevant departments responsible for production safety supervision and management, supervisory agencies, public security organs and labor unions should invite the People's Procuratorate to send personnel to participate
Submit the accident investigation report within 60 days, with a maximum extension of 60 days
Approval within 15 days, especially serious cases within 30 days; approval may be delayed up to 30 days under special circumstances
Relevant regulations on safety management of sub-projects with greater risk
When the construction unit goes through the safety supervision procedures, it shall provide a list of sub-projects and safety management measures that are more dangerous.
Supervision, the construction unit establishes a partial safety management system
Projects for which special safety construction plans should be prepared separately
Foundation pit support and precipitation
3m
Foundation pit drainage well points and water collection open drains
5m
Deep foundation pit
template
Tool-type formwork, height 5m, span 10m and above, load 10KN/m2, concentrated line load 15KN/m, full hall support system
Tool-type formwork, height 8m, span 18m and above, load 15KN/㎡, concentrated line load 20KN/m; full-floor support system such as steel structure support, single point load above 7KN
Tool-type formwork, steel structure supporting scaffolding throughout the hall
Expert argument
scaffold
Hoisting
other
Special plan preparation requirements
The signature of the person in charge of the professional subcontracting, the signature of the technical person in charge of the general contracting unit and the official seal, and the signature of the director and the professional seal.
Expert demonstration meeting
Construction unit organization
People with strong connections are not allowed to participate
Submit the argumentation report, provide clear opinions (pass, fail, pass after modification) on the argumentation content, and sign the argumentation report
Argument content
Contents of special construction plans, calculation sheets, and basic conditions for safe construction
Inform the experts after the plan is modified
Special plan preparation content
Project overview, preparation basis, construction plan, construction technology, construction safety assurance measures, construction management and operating personnel allocation and division of labor, acceptance requirements, emergency response measures, calculation sheets and related construction drawings
One person plans to change the drawings and security workmanship and should be inspected and accepted
acceptance
technical standard
Regulations on fire safety and indoor environmental pollution control
Relevant regulations on fire protection design for civil building decoration
Material combustion performance grade
A non-combustible - marble, gypsum board
B1 flame retardant - fiber gypsum board
B2 is flammable
B3 is flammable
fire-resistant level
Level 1~4
Combustion performance requirements of insulation materials for exterior wall insulation systems
Regulations on indoor environmental pollutants in civil buildings
Civil construction engineering classification
Class I
Residences, hospitals, kindergartens, schools, elderly buildings
Elderly and young children study and live
A
Class II
other
Level B1
Requirements for random inspection of indoor environmental pollutant concentrations
indoor environmental pollutants
radon
Centralized ventilation
Ventilation system is running
natural ventilation
Close external doors and windows for 24 hours before proceeding
formaldehyde
ammonia
benzene
Toluene
xylene
TVOC (Volatile Organic Compounds)
summary
Centralized ventilation
Ventilation system is running
natural ventilation
Carry out 1 hour after closing external doors and windows
Content value
The number of rooms
For those sample rooms that pass the random inspection of indoor pollutants, the number of tests can be halved to no less than 3 rooms.
5% of the number of rooms of other types, no less than 3, all tests below 3
Class I civil buildings (residence for old friends and students), 50%, no less than 20 rooms, all tests below 20 rooms
For unqualified rooms, the number of retests will be doubled, including the original unqualified rooms.
Indoor environmental pollutant concentration detection points
The sampling points should be no less than 0.5m away from the wall, 0.8~1.5m high, evenly distributed, and avoid ventilation ducts and vents.
More than 2 detection points
Diagonal, diagonal, plum blossom arrangement, average value is used as basis
quantity
50, 100, 500, 1000=1, 2, 3, 5
Each additional 1,000 points is 1 point, and the amount less than 1,000 is calculated as 1,000㎡
Just high
Standards related to foundation engineering
Relevant Provisions on Construction Quality Management of Foundation Engineering
Requirements for lime soil foundation, sand and gravel foundation
Relevant regulations on quality management of underground waterproofing projects
Requirements for underground waterproof coating waterproof layer
Organic front surface, inorganic back surface
Organic: Add waterproof coating and carcass reinforcement materials to the arc method of yin and yang corners, corners, construction joints, wall pipes, etc., with a width of not less than 500mm.
Standards related to roofing and decoration projects
Relevant regulations on quality management of roofing projects
Relevant regulations on quality management of ground engineering construction
Cushion thickness requirements
60
sand, cement concrete
80
Slag, ceramsite concrete, cement (cement, lime, sand, broken bricks)
100
Lime soil, sand and gravel, gravel and broken bricks, triple soil (lime, sand, broken bricks,)
Relevant regulations on quality management of decoration and renovation projects
Engineering data and testing data that should be provided for acceptance of residential interior decoration and decoration projects
Engineering data
Testing data
Indoor environment test report
Insulation resistance detection
hydrostatictest
Water and ventilation test report
Lightning protection test
Exterior window air tightness and water tightness test report
Chapter 1 Construction Technology
Main structure engineering
P363~420
Project management related regulations
Relevant regulations on construction project management
Engineering project management program
Project management planning
Prepare project management planning outline
Prepare project management implementation plan
Procurement and Tendering
Contract management
Contract review, conclusion, implementation plan, implementation control, management summary
design and technology
Progress management
control schedule, execution schedule
Quality Control
cost management
Project cost accounting adheres to: three synchronizations of image progress, output value statistics, and cost collection
Accounting and control test
Cost reduction amount and reduction rate
Safety production management
Green construction and environmental management
Resource management
Information and knowledge management
Communication, risk, closing, management performance evaluation
Four levels of evaluation: excellent, good, qualified, and unqualified
Provisions on General Contracting Management of Construction Engineering Projects
Project planning, design management, trial operation management
Quality, cost, safety, occupational health and environment, resources, contract management, etc.
Relevant Provisions on Organization, Design and Management of Construction Construction
content
Classification
Classification and content of construction organization design
General design of construction organization
Unit project construction organization design
construction plan
Project overview, construction arrangements, construction progress plan, construction preparation and resource allocation plan, construction methods and process requirements, etc.
Fundamental contents
Project overview, construction deployment, construction progress plan, construction preparation and resource allocation plan, main construction methods, construction site layout and main construction management plan and other basic contents
major construction management plan
Schedule, safety, quality, environmental, cost and other management plans
Preparation and approval of construction organization design
Prepared by project leader
Approval
The general design of the construction organization shall be reviewed by the technical person in charge of the project general contracting unit
The construction organization design of the unit project shall be reviewed and approved by the technical person in charge of the construction unit or its authorized personnel.
The construction plan shall be reviewed and approved by the project technical leader
General engineering
Approval by project technical leader
Special program
The technical department of the construction unit organizes expert review and the technical director of the construction unit approves
Some projects with higher risk
Implementation after signature of the technical person in charge and director of the construction unit
Prepare a special construction plan for safe construction separately
Larger scale
Organize design, preparation and approval according to unit project construction
Dynamic management of construction organization design
Major changes
Laws, regulations, norm revisions, abolitions, etc.
Major adjustments to construction methods
There are major adjustments to resource allocation
There are major adjustments to the construction environment
Implemented after re-approval
Level-by-level disclosure