MindMap Gallery CCR Report and Related Processes
This mind map, created using EdrawMind, provides a detailed breakdown of the CCR (Control Center Report) and its associated processes. It includes sections on data vessels, barge records, fuel consumption, CCR hourly reports, and daily achievements. Each section lists specific reports and forms, such as Weather Report, Haulout Ombrometer, Checker S/D/P/Q Daily, and Daily Immersewet, along with the responsible actors and submission timelines. This comprehensive structure ensures organized data collection and reporting for effective operational management.
Edited at 2025-08-01 02:41:55This mind map, created using EdrawMind, provides a detailed breakdown of the CCR (Control Center Report) and its associated processes. It includes sections on data vessels, barge records, fuel consumption, CCR hourly reports, and daily achievements. Each section lists specific reports and forms, such as Weather Report, Haulout Ombrometer, Checker S/D/P/Q Daily, and Daily Immersewet, along with the responsible actors and submission timelines. This comprehensive structure ensures organized data collection and reporting for effective operational management.
Diagram ini menggambarkan fitur-fitur FMS (Fleet Management System) yang terbagi menjadi dua kategori utama: Off The Road dan On The Road. Fitur Off The Road mencakup Customer Platform dan Customer Admin Platform (Web), yang meliputi autentikasi, login, dashboard monitoring produksi, dan tampilan langsung (peta pelacakan kendaraan) per kendaraan. Fitur On The Road lebih menekankan pada kontrol dan pemantauan yang tidak terduga (tidak digunakan secara eksplisit dalam diagram, tetapi dapat diasumsikan terkait dengan operasional kendaraan).
This mind map, created using EdrawMind, provides a detailed breakdown of the CCR (Control Center Report) and its associated processes. It includes sections on data vessels, barge records, fuel consumption, CCR hourly reports, and daily achievements. Each section lists specific reports and forms, such as Weather Report, Haulout Ombrometer, Checker S/D/P/Q Daily, and Daily Immersewet, along with the responsible actors and submission timelines. This comprehensive structure ensures organized data collection and reporting for effective operational management.
Diagram ini menggambarkan fitur-fitur FMS (Fleet Management System) yang terbagi menjadi dua kategori utama: Off The Road dan On The Road. Fitur Off The Road mencakup Customer Platform dan Customer Admin Platform (Web), yang meliputi autentikasi, login, dashboard monitoring produksi, dan tampilan langsung (peta pelacakan kendaraan) per kendaraan. Fitur On The Road lebih menekankan pada kontrol dan pemantauan yang tidak terduga (tidak digunakan secara eksplisit dalam diagram, tetapi dapat diasumsikan terkait dengan operasional kendaraan).
CCR Report
Data Vessels
(1) Form 3S The form is filled out by the dump truck driver and submitted to the box at the end of the shift; the Data staff collects it on the next day (H+1). The form is used to record the number of trips/vessels made by the driver.
Actor Driver DT
Time Time given : before shift Time filled in : during shift Time submitted : after shift
(2) Attendance The attendance form is used to validate the presence of drivers or operators.
Actor Driver Operator
Time Time given : before shift Time filled in : before shift Time submitted : After P5M
(3) Checker ETO/EFO/Jetty The form is filled out by the checker and submitted at the end of the shift; the Data staff collects it on the next day (H+1). This form is used as input and validation for the vessels data on that day.
Actor Checker ETO Checker EFO Checker Jetty
Time Time given : before shift Time filled in : during shift Time submitted : after shift
Availability Units
(1) Daily Timesheet The form is filled out by the HE operator and submitted to the box at the end of the shift; the Data staff collects it on the next day (H+1). The form is used to record the unit's weekly availability data.
Actor Operator HE
Time Time given : before shift Time filled in : during shift Time submitted : after shift
(2) Water Truck Timesheet The form is filled out by the WT operator and submitted to the box at the end of the shift; the Data staff collects it on the next day (H+1). The form is used to record the unit's weekly availability data.
Actor Operator WT
Time Time given : before shift Time filled in : during shift Time submitted : after shift
(3) Form P2H The form is filled out by the dump truck driver and submitted to the box at the end of the shift; the Data staff collects it on the next day (H+1).
Actor Driver DT
Time Time given : before shift Time filled in : before shift, during shift, after shift Time submitted : after shift
(4) Breakdown Report This report contains data on unit breakdowns experienced by the plant team over the course of a week.
Actor Plant Department
Time Time given : daily Time filled in : daily Time submitted : weekly
(5) Work Order Working order form is used to record repairs or maintenance performed by the mechanic on the unit.
Actor Plant Department
Time Time given : daily Time filled in : daily Time submitted : daily
Fuel Consumption
1. Form Refueling Material Card The form is filled out by the fuelman to record the diesel distribution used to refuel both dump trucks (DT) and heavy equipment (HE). This form is used for weekly fuel ratio data.
Actor Fuelman Operator FT
Time Time given : before shift Time filled in : during shift Time submitted : after shift
2. Tire Consumption Tire usage data from each unit in operation.
Actor Warehouse 1 Department
Time Time given : daily Time filled in : daily Time submitted : daily
3. Data Vessel
Actor Foreman Data
Time Time given : before shift Time filled in : during shift Time submitted : after shift
List P2H DT
1. Form P2H DT The form is filled out by the dump truck driver and submitted to the box at the end of the shift; the Data staff collects it on the next day (H+1).
Actor Driver DT
Time Time given : before shift Time filled in : before shift, during shift, after shift Time submitted : after shift
2. QC P2H DT This form is filled out by the P2H QC from the Production team and is used to validate the total P2H conducted for every 2 vessels completed by the driver.
Actor QC Production
Time Time given : before shift Time filled in : during shift Time submitted : after shift
List HM & P2H HE
1. P2H HE The form is filled out by the HE operator and submitted to the box at the end of the shift; the Data staff collects it on the next day (H+1).
Actor Operator HE
Time Time given : before shift Time filled in : before shift and after shift Time submitted : after shift
2. Daily Timesheet The form is filled out by the HE operator and submitted to the box at the end of the shift; the Data staff collects it on the next day (H+1). The form is used to record the operating hours (HM) of the HE units in operation.
Actor Operator HE
Time Time given : before shift Time filled in : during shift Time submitted : after shift
3. Water Truck Timesheet The form is filled out by the WT operator and submitted to the box at the end of the shift; the Data staff collects it on the next day (H+1). The form is used to record the operating hours (HM) of the WT units in operation.
Actor Operator WT
Time Time given : before shift Time filled in : during shift Time submitted : after shift
File Master MOCO Daily
1. List P2H DT
2. Working Hours
3. Fuel Consumption
4. Breakdown Report
5. Final Draft Barge
6. Barge Information
7. Availability Unit
8. Data Vessels
Intensitas Hujan
1. Weather Report Rain information shared in the group is used by the Data team to record the duration of the rainfall.
Actor Foreman MHR
Time Time given : during rain Time filled in : when the rain stops Time submitted : when the rain stops
2. Result Ombrometer The results from the Ombrometer are calculated by the Data team after H+1 following the end of the rainfall. This data is used to estimate the total volume, rainfall amount, and rainfall intensity of the previous day.
Actor Foreman Data
Time Time given : H+1 from raining Time filled in : during shift Time submitted : during shift
Input Final Draft Barges
1. Surveyor Barge Report Report provided by the surveyor after the barge is completed
Actor Surveyor
Time Time given : after barge complete
2. Data Vessel
Actor Foreman Data
Time Time given : before shift Time filled in : during shift Time submitted : after shift
Barge Recorda
1. Internal Condition
Actor
Time Time given : Time filled in : Time submitted :
2. External Condition
Actor
Time Time given : Time filled in : Time submitted :
3. Dusty Report Dusty information shared in the group is used by the Data team to record the duration of the rainfall
Actor Foreman MHR
Time Time given : during dust Time filled in : when the dust stops Time submitted : when the dust stops
4. Weather Report Weather report shared in the group is used by the Data team to record the duration of the rainfall as a reference for their EWH (Effective Working Hours).
Actor Foreman MHR
Time Time given : during rain Time filled in : when the rain stops Time submitted : when the rain stops
5. Slippery Report Slippery information shared in the group is used by the Data team to record the duration of the slippery time as a reference for their EWH (Effective Working Hours).
Actor Foreman MHR
Time Time given : during slippery Time filled in : when the slippery stops Time submitted : when the slippery stops
6. Maintenance Report Maintenance Hauing Road information shared in the group is used by the Data team to record the duration of the MHR time as a reference for their EWH (Effective Working Hours).
Actor Foreman MHR
Time Time given : during maintenance after slippery Time filled in : when the maintenance after slippery stops Time submitted : when the maintenance after slippery stops
7. Ground Test Report Maintenance Hauing Road information shared in the group is used by the Data
Actor Foreman MHR
Time Time given : during maintenance after slippery Time filled in : when the maintenance after slippery stops Time submitted : when the maintenance after slippery stops
7. Result Ombrometer The results from the Ombrometer are calculated by the Data team after H+1 following the end of the rainfall. This data is used to estimate the total volume, rainfall amount, and rainfall intensity of the previous day.
Actor Foreman Data
Time Time given : H+1 from raining Time filled in : during shift Time submitted : during shift
CCR Hourly Report
1. Checker Report per 3 Hours This report is used to obtain interim achievements every 3 hours.
Actor Checker ETO/EFO/Jetty
Time Time given : during shift Time filled in : during shift Time submitted : during shift
2. Form 3S The form is filled out by the dump truck driver and submitted to the box at the end of the shift; the Data staff collects it on the next day (H+1). The form is used to record the number of trips/vessels made by the driver.
Actor Driver
Time Time given : before shift Time filled in : during shift Time submitted : after shift
3. Barge Information Information regarding the barge provided by the owner.
Actor Owner
Time Time given : Time filled in : Time submitted :
Daily Achievement
1. 3S Form The form is filled out by the dump truck driver and submitted to the box at the end of the shift; the Data staff collects it on the next day (H+1). The form is used to record the daily achievement attained.
Actor Driver
Time Time given : before shift Time filled in : during shift Time submitted : after shift
2. Checker ETO/EFO/Jetty The form is filled out by the checker and submitted at the end of the shift; the Data staff collects it on the next day (H+1). This form is used for the recap of daily achievements.
Actor Checker ETO Checker EFO Checker Jetty
Time Time given : before shift Time filled in : during shift Time submitted : after shift
3. Intermediate 1 Information from the surveyor regarding the total amount filled in the barge.
Actor Surveyor
Time Time given : Time filled in : Time submitted :