MindMap Gallery China Construction System-Engineering System System Documents
China Construction Systems Engineering System must learn the system documents, which project managers and production managers should know and understand. It is full of useful information. Friends in need should quickly collect it!
Edited at 2024-02-05 10:23:41Avatar 3 centers on the Sully family, showcasing the internal rift caused by the sacrifice of their eldest son, and their alliance with other tribes on Pandora against the external conflict of the Ashbringers, who adhere to the philosophy of fire and are allied with humans. It explores the grand themes of family, faith, and survival.
This article discusses the Easter eggs and homages in Zootopia 2 that you may have discovered. The main content includes: character and archetype Easter eggs, cinematic universe crossover Easter eggs, animal ecology and behavior references, symbol and metaphor Easter eggs, social satire and brand allusions, and emotional storylines and sequel foreshadowing.
[Zootopia Character Relationship Chart] The idealistic rabbit police officer Judy and the cynical fox conman Nick form a charmingly contrasting duo, rising from street hustlers to become Zootopia police officers!
Avatar 3 centers on the Sully family, showcasing the internal rift caused by the sacrifice of their eldest son, and their alliance with other tribes on Pandora against the external conflict of the Ashbringers, who adhere to the philosophy of fire and are allied with humans. It explores the grand themes of family, faith, and survival.
This article discusses the Easter eggs and homages in Zootopia 2 that you may have discovered. The main content includes: character and archetype Easter eggs, cinematic universe crossover Easter eggs, animal ecology and behavior references, symbol and metaphor Easter eggs, social satire and brand allusions, and emotional storylines and sequel foreshadowing.
[Zootopia Character Relationship Chart] The idealistic rabbit police officer Judy and the cynical fox conman Nick form a charmingly contrasting duo, rising from street hustlers to become Zootopia police officers!
Engineering system system documents
China Construction Seventh Engineering Group Southwest Company Project Management Assessment Methods
Definition of Terms
Prepare project
Personnel entering the site
Temporary construction
Preliminary preparation
No physical construction yet
Projects under construction
Engineering entity construction
Closing project (choose 2 out of 5)
Engineering entity completed
Monthly output value is less than 1 million yuan
handover stage
Branch acceptance completed
Except for synergy and nails, all have been completed
Appraiser
company
Company leaders lead the team
Head of Department
Deputy Department Manager and Professional
branch
Head of the branch leadership team and key members of relevant systems
frequency
focus, investment, strategy
Once every quarter
other
once a year
Business department once a year
Assessment criteria
shares
"Project Management Handbook"
"Safety Production Management Manual"
Engineering Bureau
"Project Management Standards"
"Project Management Core Process"
"Several Provisions on Strengthening Project Management"
"Project Planning Book", "Project Department Implementation Plan"
Documents and systems related to the company’s various business systems
Project planning management implementation details
General principles
Work
Preparation and approval of "Project Plan" and "Project Department Implementation Plan"
Preparation and approval of special plans
Dynamic management during implementation
Reference
"Project Management Manual", "Project Management Standards", "Infrastructure Project Management Standards", "General Contracting Management Outline of China Construction Seventh Engineering Bureau Co., Ltd.", "Guidelines for Preparation of Project Planning Documents of China Construction Seventh Engineering Bureau Co., Ltd.", " China Construction Seventh Engineering Bureau Lean Construction Implementation Guidance Manual
Work requirements
EPC, PC, PPP, DB, BT, BOT
General Contracting Management Outline
General construction contracting project
"Guidelines for Preparing Project Planning Documents of China Construction Seventh Engineering Group Co., Ltd."
project proposal
in accordance with
Bidding Documents
drawing
specification
Craftsmanship
Institutional processes and strategic requirements
time
Complete preparation and approval before project entry
Kick-off meeting for 7 days
5 days for review and approval
Responsibilities
First person responsible
General manager
organize
CEO/Vice President of Production
Responsible
Other team leaders
Permissions
Summary
Branch Engineering Management Department
Approval
Branch Project Management Committee
Filing
Company Engineering Department
Project department implementation plan
in accordance with
project proposal
construction drawings
specification
Craftsmanship
Project Management Objective Responsibility Letter
Company related systems and processes
time
Within one month after the completion of the "Project Plan" or before the official start of construction
Responsibilities
First person responsible
project manager
Responsible
Other teams
Summary, approval, archiving
Project Chief Engineer
Permissions
Large and above
Approval
Branch General Manager
Filing
Company Engineering Department
Large or below
Approval
project
Filing
branch
Management responsibilities
project proposal
Confession
Vice President of Production
Daily supervision, guidance and spot checks
Company Engineering Department
Responsible department, leading preparation, approval and execution
Branch Engineering Department
Project implementation plan
Confession
project manager
Daily supervision, inspection and correction
Branch Engineering Department
process management
Project Department
analyze
Monthly project management meeting
Ledger
Project planning and implementation plan
Implementation
Deviation cause analysis
measure
Project planning adjustments
Within 20 days of being affected
force majeure
Construction Organization
Important nodes
market outlook
Shortage of resources
Procurement methods and division of bids
other
Project implementation plan adjustments
Within 10 days of being affected
Project planning adjustments
Major changes to the contract, major changes to the design drawings, major changes to the construction plan
Stakeholder reasons
Significant changes in on-site construction conditions
Detailed Implementation Rules for Construction Schedule Management of Southwest Company of China Construction Seventh Engineering Group Co., Ltd.
Definition of Terms
Big plan management
Including progress plan, work plan and resource allocation plan
Progress warning
Compare the actual progress of the project with the approved overall progress plan
Work Plan
Taking the overall progress plan as the main line, sort out the pre- and post-processes of each process, extending to each Construction conditions of the process (such as contract signing, plan preparation and review, resource preparation, basic conditions wait)
Project phase division
Construction preparation stage
It refers to the stage when project management personnel have entered the site and are in temporary construction and preliminary preparation, but have not yet entered the physical construction of the project.
In the implementation stage
Refers to projects that have entered the physical construction stage of the project
Closing stage (no less than 2 items)
(1) All the physical engineering work in the contract has been completed. (2) The monthly output value is less than 1 million yuan. (3) The project has entered the delivery stage. (4) The acceptance of branch projects has been basically completed. (5) Except for professional collaboration and Party A’s subcontracting, the rest of the work has been completed.
shutdown phase
Projects that are in a state of suspension due to various reasons and have no output value
Delayed construction phase
Due to various reasons, the project could not be constructed at the normal construction speed for more than one month in a row, and the monthly output value was less than 1 million yuan.
Management philosophy
Adhere to the "1234" construction period management concept, that is, determine one overall construction period goal, carry out 2 plans (project planning and project department implementation plan), formulate 3 plans (progress plan, work plan and resource allocation plan), and implement 4 plans Stage management (tender planning stage, construction preparation stage, construction stage, closing stage).
basic requirements
Planning and plan editing and review rate on time 100%
"Project entry planning", "Project planning document", "Period management plan", overall project progress plan, Resource allocation plan, work plan
Progress planning system online rate 100%
Network diagram plan coverage 100%
Planning management post setting 100%
Project delivery rate on schedule 100%
Mainly deal with risks
(1) Construction deadline defaults and economic penalties due to delays in the construction period.
(2) Work was stopped due to delays in the construction period, causing the sub-supplier to file financial claims against us.
(3) Increased project costs due to delays in the construction period or rush to the construction period.
(4) The legitimate rights and interests of the project were damaged due to the delay in handling the construction period management process data in a timely manner.
Five stages of management
Tender planning stage management
The compiler and review unit of the "Project Plan" needs to conduct a feasibility analysis of the project period based on the bidding documents and the "Project Plan Guidelines", combined with the construction conditions, construction deployment and main construction organization plans, taking into account the risk factors of the project period, and clarify the construction period objectives and main nodes. Construction period plan (first-level node plan)
(2) The overall schedule in the "Project Plan" needs to be prepared using a double-code network diagram
(3) The main resource allocation and organization needs in the "Project Plan" match the progress plan.
(4) If there are major changes in the first-level node plan, the "Project Plan" needs to be adjusted and submitted to the original approval unit for re-approval.
The overall bidding progress plan needs to respond to the node targets of the bidding documents and form an external overall progress plan and an internal control overall progress plan.
Construction preparation stage management
Construction schedule management plan
"Construction Period Management Plan" as part of the "Project Department Implementation Plan"
The "Construction Period Management Plan" is organized and prepared by the project production manager, and after review by the project manager, it is submitted to the company/branch (division) competent department for approval.
The "Construction Period Management Plan" is prepared during the construction preparation stage and needs to be completed before the official start of the project. The project production manager is responsible for briefing the project management personnel.
The content of the "Construction Period Management Plan" needs to clarify the first and second-level node objectives of the project, analyze the project period and risk factors, determine the specific ideas and methods of project progress management, and plan responses to the risk factors during the construction period.
The "Construction Period Management Plan" needs to be coordinated with the management plans of each business system (such as capital plans, etc.) and matched with the overall deployment of the superior unit
During the implementation of the "Construction Period Management Plan", if major changes occur that require adjustment (such as changes in first- and second-level nodes), timely adjustments must be made according to the original procedures before re-approval and disclosure.
overall schedule
The overall progress plan is organized by the project manager and compiled by the project chief engineer.
The overall progress plan needs to be completed within 30 days after the project enters the site. It can only be reported to the supervision unit and construction unit after being approved or filed by the chief engineer of the company/branch (division).
The content of the overall schedule plan should include: contract duration requirements, assumptions, indicator descriptions, construction deployment, interspersed construction instructions, implementation key points and difficulties, risk estimation and countermeasure schedule arrangements, resource demand plans and progress assurance measures, etc.
The overall schedule plan should systematically sort out the main construction procedures of the project and clarify the logical relationships between the procedures, determine the interleaving time of the preconditions and procedures, and refine it to at least secondary nodes.
The overall schedule must adopt the network diagram schedule prepared by schedule management software and reflect the key lines and milestones of the project.
In addition to being submitted to the supervisor and owner for approval as agreed, the overall progress plan also needs to be reported to the branch office for filing. The overall progress plan reported to the company for filing must be divided into unit projects, key nodes must be determined, and each process must be divided into monthly segments.
According to the overall progress plan and node control plan, the production manager of the project department organizes and prepares phased project progress plans (annual, quarterly, monthly, weekly) based on the actual progress of the project.
Based on project planning, owner requirements, and progress plans, the branch will sort out the most important nodes of the next year's project at the end of each year. In principle, each project will sort out 3-5 important nodes. The node types are first-level nodes, important nodes required by the owner, and key nodes. Process interspersed nodes. And establish the branch's annual important node plan and submit it to the company's engineering department for filing. The company's engineering department summarizes and establishes the annual company's important node plan.
resource allocation plan
The resource allocation plan needs to match the overall progress plan, including labor, materials, turnover materials, and mechanical equipment allocation plans.
The labor resource allocation plan is organized and compiled by the production manager. The labor resource allocation total demand plan is required to cover the project from start to completion, and cover all types of work involved in the project on a monthly basis. The labor resource allocation plan can be used as the basis for subcontracting bidding negotiations, temporary facility preparation and other related work.
The total material demand plan is organized and compiled by the project business manager, fully considering the processing and transportation cycles of materials, and clarifying the use cycle and usage volume to ensure accurate calculation of capital flow and the fulfillment of project deadlines.
The configuration plan for mechanical equipment and turnover materials shall be prepared by the chief engineer of the project. The model, quantity, main parameters and entry (exit) time should be clearly defined.
Start of construction management
After winning the project bid, the company (branch) should complete the project approval within 7 days and complete the entry of project management personnel in batches according to the agreed time.
After the project is awarded the bid, the project manager should timely implement the work plan in the construction preparation stage based on the construction site and drawings handed over by the owner, complete site preparation, technical preparation and resource preparation, connect with social resources, assist the construction unit to handle relevant procedures, and achieve the start of construction as soon as possible condition.
When the project meets the conditions for start of construction, the project department shall obtain a start of work report (or start of work order) for part or all of the working areas in accordance with prescribed procedures.
The start-up report (or start-up order) needs to specify the specific handover conditions and time of the site.
For projects that fail to officially start on schedule, the project department should analyze the reasons that affect the project's on-schedule start, take classified measures, and proactively coordinate the start-up matters. If the project cannot start on schedule due to reasons not caused by us, the project department should provide relevant certification materials for the delayed start to the supervisor or construction unit before the agreed official start time. The engineering department of the company (branch) should establish a ledger of delayed start projects, assign a dedicated person to follow up on the early progress of the project, and coordinate relevant resources to help the project start as soon as possible.
Construction phase management
Plan released
After the overall progress plan is approved, the project chief engineer will give the final report. (Management staff and subcontractors)
Each responsible engineer shall explain the production plan of his/her work area or working surface to the construction workers at monthly and weekly meetings and during the construction period coordination meeting, and sign for confirmation.
Plan execution
Responsible engineers supervise, control, and guide the construction process
The project production manager should organize relevant responsible engineers to allocate, coordinate, and manage construction site resources based on construction deployment at each stage, construction period node requirements, overall site layout, and related plans.
The project department conducts daily inspections and weekly and monthly inspections on the construction progress. The inspection contents include: the quantity of work completed, the execution of working hours, the execution of work sequence, the use of resources and the matching with the schedule, and the rectification of problems raised in the previous inspection. At the project production coordination meeting, the construction period will be counted, analyzed, control measures will be taken, and the implementation of the project period will be reported on time.
Work Plan
During the project construction phase, each department of the project department and each manager should develop a work plan.
The project work plan is organized and compiled by the project manager, with the overall progress plan as the main line, decomposing the work tasks, sorting out the pre-processes and post-processes of each process, and extending to the construction conditions of each process (such as contract signing, plan preparation and review submissions) , resource procurement and processing, basic conditions, etc.), indicate the work plan, responsible unit, responsible person, responsible time, supervisor, etc. for each matter.
Project work plans can be divided into department work plans and individual work plans based on hierarchy or business systems, and can also be divided into internal work plans and external work plans based on scope of use.
The department work plan is decomposed based on the project work plan, and the work items involved in this business system are refined, and the work process, responsible person and time are refined to improve the execution efficiency of the work plan.
The internal work plan mainly reflects the business collaboration between the project department and all levels of the enterprise, such as plan preparation and review, bidding and procurement, resource entry, etc. The external work plan mainly reflects the business collaboration between the project department and construction related parties. The process external work plan is organized and compiled by the relevant leaders in charge of the project. The preparation instructions or schedules of the overall progress plan reflect the responsibilities of the relevant parties, the insertion time nodes of the relevant work, etc., and the coordination of the work of the relevant parties is mainly communicated through letters, meeting minutes, etc. time requirement.
Early warning and correction
Construction delay warning is divided into planning management system warning and manual statistical analysis notification warning.
Warning level
When there is a general delay in the construction period of a key line in the schedule, the project department must promptly analyze the reasons and formulate corrective measures, and report the delay and planned measures to the engineering department of the superior unit. The engineering department of the superior unit implements dynamic monitoring of this project and tracks and supervises the implementation and results of corrective measures.
When there is a serious delay in the construction period of a key line in the schedule, the project department should take corrective measures in a timely manner and report the delay and corresponding measures to the engineering department of the superior unit.
Shutdown project management
Short term (7 days), medium and long term (7 days-3 months), long term (more than 3 months)
Before the project is suspended, the project department should promptly analyze the reasons for the suspension, predict the shutdown time, take countermeasures, make arrangements for the suspension and resumption of construction, and proactively take measures during the suspension to promote the timely resumption of the project to minimize the impact of the suspension on the construction period.
In the long term, report to the company for decision-making and the Engineering Department of the Engineering Bureau for filing. The branch/company formulates personnel diversion and equipment shutdown plans
The project department should report the shutdown situation to relevant parties according to procedures before work is stopped (or on the day of work stoppage).
The company/branch (division) should establish a ledger of suspended projects, coordinate relevant resources with the project, and handle business matters such as construction period visas.
Closing stage management
Preparation of closing plans, on-site clean-up, project completion acceptance and handover, disposal of project department assets and remaining materials, and withdrawal of project department management personnel.
Three months before the project enters the closing stage, a closing plan shall be formulated, which must include but not be limited to the remaining work progress plan on site, the closing resource allocation plan, the branch project and special acceptance plan, the material and asset allocation plan, the project department management personnel arrangement plan, Other plans that need to be prepared.
Implementation of closing goals and responsibilities
In December every year, the branch will sort out the projects planned to be completed in the next year based on the contract, project planning, project progress plan, and actual project conditions, and report them to the company's engineering department for record
The company and its branches agree on annual closing targets and reward and punishment standards by signing an annual target responsibility letter.
The branch company and the project department sign a closing target responsibility letter at the beginning of each year, agreeing on the closing work targets and reward and punishment standards.
Finishing work advanced
Funding tilt
3 months to complete. In case of force majeure, the written report will be extended to 6 months.
The week before, take another inventory of the remaining work
Develop a problem list
Hold daily huddles
Monthly inspections of branches covering closing projects
Project acceptance and delivery
Project closing work plan and approval
The project production manager is responsible for taking the lead in organizing the project completion and handling the delivery procedures.
Compilation of construction period data
External construction period information
Project final settlement and project management data filing, including planning data such as the overall progress plan, progress process control data (construction logs, meeting minutes, production reports, correspondence, process settlement data, construction period visas, etc.), completion acceptance and delivery certification materials wait.
Internal construction period information
Project duration management summary, assessment and filing, including planning information such as duration management plan, progress plan, resource allocation plan and work plan, etc. Classification data, progress process control data (construction logs, system entry data, meeting minutes, production reports, correspondence, process settlement data, construction period visas, etc.), completion acceptance and delivery certification materials, construction period management summary, etc.
Construction period management summary
The project duration management summary is organized and compiled by the project production manager during the project closing stage. It is necessary to analyze and summarize the implementation effects and process control conditions of the two plans and three plans. concluded and summarized in the "Project Department Management Summary Report".
Construction period risk management
Risk Identification
organizational risk
Organizational structure model, work processes, division of tasks and management functions, capabilities and experience of relevant party managers and workers
Manage risk
Construction organization arrangements, quality and safety issues handling, general contracting coordination and management, and process data handling.
Contract risk
The contract stipulations are unclear and the contract signing is unreasonable
Resource risk
Resource allocation status of sub-suppliers (including fingernails) and funding status
technology risk
Geological conditions, operating environment, design, and construction plans
Employer risk
The contractor has poor credit and funds, delays in site handover and procedures, and adjustments to the pace of development, etc.
Other risks
Policy influence (including large-scale conferences and activities), local monopoly, force majeure, water and power outages, severe weather, etc.
risk assessment
Risk assessment in the planning stage
Implementation stage evaluation
"Construction Project Management Specifications" (GB/T50326-2017), Divide construction period risks into four levels according to different degrees
Level 1 risk
The probability of occurrence and amount of loss are the highest, and there are serious construction period, business and legal risks.
Secondary risk
The higher the level, the more serious the risk consequences, and the more difficult it is for the project to fulfill its construction deadline.
Level 3 risk
The level is average, the risk consequences are average, and certain measures can be taken to achieve the performance of the construction period.
Level 4 risk
The level is lower, the probability of occurrence is lower, the amount of risk loss is smaller, and it has less impact on the performance of the construction period.
risk response
Risk Countermeasures
Risk avoidance, mitigation, retention, transfer and organization strategies
risk response
Level 1 risk
Tender planning stage
The planning results determine the feasibility of project undertaking
construction stage
Report the risk assessment results and corrective measures to the company's engineering department step by step, and the main leaders of the company (branch) will decide on risk control measures
Secondary risk
Tender planning stage
The planning results determine the feasibility of undertaking the project, and it is necessary to ensure that the construction period risks are under control.
construction stage
Report the risk assessment results and corrective measures to the company's engineering department step by step, and the main leaders of the company (branch) will decide on risk control measures
Level 3 risk
Tender planning stage
Effective resolution of construction schedule planning
construction stage
Report the risk assessment results and corrective measures to the company's engineering department for filing.
risk control
prior control
two stages
Tender planning stage, construction stage
Two in advance
"Project Planning Book" and "Construction Period Management Plan" comprehensively identify and plan construction period risks
Big plans (overall progress plan, work plan, resource allocation plan) are sorted out and approved in advance
control during events
Three in place
Resources are guaranteed
Plan implemented in place
The procedures are in place
Construction records are complete, and relevant instructions, letters, initials, visas, meeting minutes, sub-supplier confirmation information, etc. are completed and retained in a timely manner
Three in time
Timely warning
Timely correction
After analyzing the reasons for the delay in the construction period, timely optimize the construction organization or plan, rationally allocate resources and other corrective measures
resolve in time
ex post control
Form a written summary report
Handle work visa claims in a timely manner
Promptly hold responsible persons accountable
Construction period target assessment
Branch office’s project assessment
and subcontracting assessment
Penalties for complaints arising from performance issues
General complaints
serious complaint
1) Repeated complaints about the same item
2) Complaints in writing or by visits from owners of strategic customer headquarters or bureau investment projects
3) Complain to China State Construction Engineering Corporation Limited or government authorities
4) The complaint is serious and must be coordinated and resolved by the bureau leaders.
Major complaints
1) The same project has been complained about three times or more within one year
2) The complaint is particularly serious and has a major negative impact on the company, and must be coordinated and resolved by the main leader of the bureau. of.
written complaint
plan management system
Planning and release
(1) The engineering department of the company/branch (business department) is responsible for project establishment and online release of plans
(2) After the project is approved, the project planning administrator will complete and put the approved overall progress plan online before the project officially starts.
(3) The overall project plan should be refined to third-level nodes
(4) According to the overall progress plan, each system will sort out and compile its own supporting work plans, such as bidding and procurement plans, in-depth design and dual optimization plans, program preparation and review plans, large equipment entry and exit plans, etc.
Key node settings
The first and second level nodes of the project are used as key nodes for system assessment and early warning, and arbitrary changes are prohibited.
Plan execution and assessment
The project plan management personnel are responsible for collecting and reporting the actual image progress in a timely manner and updating it at least once a month.
The branch company assesses and reports on the implementation of the project progress plan on a monthly basis.
Plan warning and adjustment
Use red, yellow and blue lights for early warning control
When the project node progress exceeds the warning value, the warning will be automatically initiated.
When there are major changes in the project construction period, the original plan no longer has a guiding role, and the visa claim procedures have been processed for the delayed construction period, the project department can re-prepare the overall schedule based on the official documents of the relevant parties, and re-examine and implement it according to the original procedures.
Materials Management Implementation Rules
General principles
management principles
Hierarchical authorization
Three levels of management
Approval system
No purchase or use is allowed without approval
Separation of procurement and protection
Procurement and storage (acceptance) cannot be held concurrently
save
Eliminate backlog and waste, reduce losses and speed up turnover
timely
Handle acceptance, storage, shipment, inventory, accounting, and report preparation in accordance with regulations
Materials in and out of the warehouse are cleared on a daily basis and monthly
accountability
the term
consumable supplies
Steel, cement, masonry, etc.
turnover supplies
Formwork, brackets, wood, temporary facilities, etc.
Odd supplies
Hardware, tools, labor insurance, low-value consumables, etc.
Responsibilities
Material management responsibilities of the company's engineering department
Material management responsibilities of branch engineering department
Project Materials and Equipment Department Management Responsibilities
On-site material management standardization
Collection and management of total project material demand plan and monthly (node) demand plan for materials
Prepare project monthly (node) procurement plan and supply plan
Material arrival, acceptance, warehousing, warehousing, material return, inventory, settlement
Material allocation, waste material disposal
Material vouchers, ledgers, reports, and accounting
Material business informatization
Dynamic evaluation and daily management of suppliers
Qualification Management Responsibilities of Project Engineering Management Department
Prepare monthly (node) demand plan and batch supply plan for materials
Participate in the acceptance and inventory of incoming materials
Responsible for project materials outbound and requisition management
Comparative analysis of material consumption
Cooperate with the setting up and planning of material storage yards, processing sites, warehouses, and on-site roads
Project Technical Quality Department
Quality and technical parameter review
Sampling and testing
Prepare demand plans for revolving materials and semi-finished products processing
Participate in the acceptance of materials with special quality requirements
Corporate level and material position responsibilities
Supervision and implementation system
Branch leaders in charge
Implement thoroughly and reduce losses
project manager
Materials Engineer
Acceptance, use, allocation, return of materials and turnover materials, material identification management, inventory of waste materials
Participate in material procurement negotiations and inspection and evaluation of material suppliers,
Reports, collection and archiving
Librarian
Warehouse settlement, storage and distribution
Ledger
Pre-planning
The branch engineering department, project materials and equipment department, and business contract department prepare project planning documents
Branch Engineering Department
Allocate material personnel
Materials, turnover materials, machinery and equipment configuration plans, resource organization methods
Project Materials Department
Prepare material management implementation plan
Develop material consumption control indicators and measures
Indicators are broken down into departments and individuals
Cooperate with project engineering department and technology department
Material storage yard, processing shed, warehouse, and on-site transportation route planning
Material acceptance measurement, testing equipment planning
The construction site must be equipped with a weighbridge
Plan management
General material requirements plan
Time: Within 15 working days before the start of construction
prepared by
The "Project Materials Total Demand Plan" prepared by the Project Commercial Contract Department based on the bill of quantities and the construction plan of the Technical Department
Review
business manager
Approval
project manager
Filing
Branch Engineering Department
illustrate
Consumption control indicators of major supplies
Monthly (node) demand plan for materials
Time: Before the 25th of each month (or 20 days before the start of the node project)
prepared by
Responsible Engineer
Monthly construction progress plan
Review
Production manager, business manager
Approval
project manager
As the basis for current supply
Monthly (node) purchasing plan for materials
Time: before the 25th of each month (or material arrival arrangements)
prepared by
Materials and Equipment Department
Monthly (node) demand plan for materials
Inventory last month
Review
business manager
Approval
project manager
Purchase after approval
Material batch supply plan
Time: Construction progress, on-site material usage
prepared by
Project Engineering Department
Review
Materials and Equipment Department Manager, Business Manager
Approval
project manager
The batch supply plan shall not exceed the total monthly purchase plan
Semi-finished product processing plan
prepared by
Technology Department
Review
Chief Engineer
Approval
project manager
A material supply plan
Procurement management
Procurement Management Measures
Customer management
Supplier Management Measures
Contract management
Contract Management Measures/Implementation Rules
A supply material management
Monthly site entry plan reported to owner
Quality, sample, price visa and purchasing process records
Acceptance personnel shall notify Party A and the supervisor
Monthly and settlement procedures shall be reviewed by the business manager and project manager and reported to the owner for record.
Subcontractor material management
Subcontract with full-time staff, and a written authorization letter should be filed with the Materials Department.
When the subcontractor's materials arrive, fill in the "Subcontractor's Material Arrival Record" and notify the test engineer 24 hours if inspection is required.
To exit the venue, go to the Materials Department to register, go through the exit procedures, and only go out with the "Exit Permit"
Acceptance management
Acceptance personnel
No less than 3 people
Materials, engineering, business and technology participation
Require
Highly technical
Quality inspectors and responsible engineers must participate
Sampling retest
The test engineer must
Safety protection and labor insurance
security officer
Subcontracted out
Authorized picker to participate
Offering
Party A, supervision
Acceptance Time
Handle warehousing procedures within 24 hours
It is strictly prohibited to use it before it is stored in the warehouse
Acceptance process
Check voucher
Goods, contracts, supply plans
Delivery note, factory inspection report, material certificate, product qualification certificate, relevant quality, safety, environmental protection and other information
Label content, physical object
Quantity acceptance
Point inspection, delivery order inspection is strictly prohibited
Weighing materials, weighing trucks, and keeping lists. "Material Weighing Ledger"
commercial concrete
The receipt is weighed and reviewed
If the net usage is recorded as shown in the figure, the weighing and random inspection shall not be less than 10%.
Measured by receipt, the vehicle is weighed
Key review content
label
Test weight
Invoice net weight and actual net weight
Appearance quality acceptance
Appearance and packaging, fill in the acceptance form
After the appearance is judged to be qualified, the physical or chemical materials need to be marked "to be inspected"
Acceptance record
"Acceptance Form"
Materials Engineer
Sampling retest
Test engineer sampling
To be inspected identification
Test failed
Unqualified mark
return form
qualified
Materials Engineer
Material acceptance form
Librarian
Warehouse receipt
Material storage ledger
Storage management
Outbound management
in principle
"Plan control, quota collection, first in, first out"
Authorized picker
Establish an authorized picker for labor entry
"Power of Attorney"
Copy of ID card of the recipient (signed by the legal person and stamped with official seal)
out of warehouse
"Outbound (receipt) sheet"
Sign first and then issue
Register "Material Outbound Ledger"
Quota picking
Strictly follow the corresponding material loss quota to receive and distribute
in accordance with
Total material requirements planned quantity
Enterprise consumption quota
Quantity and Material Analysis of Responsibility Cost
contract
process
contract
The contract should clearly specify the rewards and penalties for exceeding the quota of materials.
Before starting work
The Commercial Contract Department organizes the Materials Department and other departments to provide labor service explanations
The disclosure letter clearly states the loss rate and is signed for confirmation.
form
"Limited Material Collection List"
Outbound process
Application plan approval
Prepare "Limited Material Collection Plan"
Responsible Engineer
Check
Person in charge of subcontracting unit
Approval
project manager
Picking (outbound) order
fill in
unit of use
Review
Person in charge of the user unit
Approval
project manager
Outbound order
fill in
warehouse keeper
Notice
Indicate the specific area of use
Material distribution
Sign first and then issue materials (warehouse release form)
Materials Engineer
Check the outbound order
Register materials out of warehouse ledger
If the "Limited Material Requisition Plan" is exceeded, report it in time, and the project manager will organize to find out the reasons. Over-consumed materials shall not be released without approval.
Odd supplies for personal use
Fill out the outbound order
Recruiter
Review
Head of materials department
Approval
production manager
Register
Material delivery ledger
Consumption management
The Materials and Equipment Department submits statistics, analysis and improvement instructions on material consumption at the monthly cost activity analysis meeting
In case of backlog, waste, damage, burial, loss, etc., the relevant responsible persons shall be held accountable.
Main material consumption control indicators
Steel scrap rate
1.5%
Amount of concrete entering the site
Net usage shown in the picture
Steel pipe rental damage rate
1.5%
Fastener rental damage rate
3%
by month
"Main Material Budget and Consumption Comparison Table"
Actual consumption and amount
Department of Materials
Image progress and physical project quantities
Engineering Department
The amount of general contract revenue (budgeted amount) and the corresponding amount
Ministry of Commerce
Relevant departments will identify the causes and responsibilities for main material consumption and formulate follow-up measures.
Review
Production manager, business manager
Approval
project manager
Filing
branch
branch
Establish mechanism
supervise
Correction
Subcontract
Reward and punishment measures, keep records of rewards and punishments
inventory
time
Before the 25th of each month (can also be consistent with the subcontracting metering statistical image progress date)
Inventory count (semi-annual/annual count on June 25th/December 25th each year)
Responsible Engineer
Material inventory list
Inventory list of turnover materials
Inventory of spare and waste materials
Material inventory list
fill in
Materials Engineer
signature
Finance, Engineering, Business
confirm
Material manager, project manager
Pan Ying
Withdrawal at the end of the month
Balance basis
Write-off of next month's outbound shipment
loss
Analyze the reasons
Develop measures
transfer
in principle
Apply first, then transfer
Apply
Materials Department to Branch Engineering Department
fill in
Requisition
confirm
Transfer in and out materials department manager, project manager
Approval
Vice President of Production
Ledger
Call out supplies
Warehouse withdrawal-transfer-outside processing vouchers and registration ledger
Transfer in supplies
The transfer order is based on the warehouse-out order of the transferred project, and the warehouse-in voucher and registration ledger are processed.
Waste material disposal
centralized purchasing
Branch year/half year
Project self-tendering
Project status description, branch approval and filing
funds
Branch special account
Financial officer
Offset project costs
program
Apply first, then approve, then process
Application filling
"Waste Material Disposal Application Form"
Materials and Equipment Department
Branch approval
Process filling
"Waste and Used Materials Disposal Sheet"
Materials and Equipment Department
Waste materials disposal ledger
Turnover materials management
Rental type
time
Within 30 days after entering the site or starting construction
Technical Quality Department
"General Demand Plan"
On-site acceptance
personnel
Various departments and user units
material
The materials engineer fills out the "Returnable Materials Entry/Exit Order" and promptly registers the "Returnable Materials Entry/Exit Order Ledger"
Exit
personnel
The Materials and Equipment Department will work with the Project Management Department, labor (subcontracting) units, suppliers, and project gatekeepers to conduct inspections and handovers
material
"Return Sheet for Turnover Materials"
"Turnover materials entry/exit single ledger"
Self-purchased
Approval by the branch and reported to the company for filing
Establish a "Project self-purchased turnover materials management ledger"
Exit pass management
The guard collects and delivers to the office
Settlement management
Monthly (or regularly)
Handle material purchase (lease) reconciliation/settlement form with suppliers
25th of every month
"Monthly Report of Materials Receiving, Receiving and Depositing"
After being reviewed by the material and equipment department manager and business manager, it will be submitted to the project financial accounting team for accounting audit, and the project manager will review it. Approval and report to the material management department of the branch for archival purposes.
Collection of costs by month
Internal management
"Material Contract Ledger", "Material Weighing Ledger", "Material Incoming Ledger", "Material Outgoing Ledger", "Leasing and Turnover Materials Entry and Exit Ledger", "Waste Material Disposal Ledger", " Project Turnover Material Ledger", "Material Income and Expenditure Report", "Material Inventory Form", "Main Material Consumption Comparative Analysis Form"
Project material vouchers include: acceptance form, warehousing form, picking list, outgoing form, return form, transfer order, etc.
The project material engineer is responsible for the daily custody of various material vouchers and material accounts. The accounts should be compiled, printed, reviewed and signed on a monthly basis. After accounting and write-offs, they should be bound into a book with a bottom copy of the voucher and filed. Within 30 days after the project is handed over, the Materials and Equipment Department of the project department should hand over all vouchers and accounting information to superiors The materials management department files it for future reference. In case of job relocation, material accounts, tables and registers should be handled in a timely manner Waiting for the transfer procedures of internal industry information.
Detailed Implementation Rules for Labor Management of China Construction Seventh Engineering Group Southwest Company
General principles
management principles
Principles of legal person management projects
Hierarchical management principles
Whole process management principles
continuous improvement principle
People-oriented principle
Project department management structure and division of responsibilities
Clarify the department responsible for labor management, and have a member of the leadership team in charge of labor management.
Each project must be equipped with at least one certified labor and management supervisor. For projects with more than 500 people, an additional labor and management supervisor should be added for every 1,000 additional people.
Implement management requirements such as real-name management of labor services, separate account system, special accounts for farmers’ wages, agency wages, and public disclosure of rights protection for migrant workers.
Participate in the evaluation and assessment of the performance of subcontracting units
Responsible for the supervision and management of farmers’ wage payment
Protect the legal and legitimate rights and interests of labor workers, promptly discover and properly handle on-site disputes
Organize project labor management information and retain it in accordance with government and enterprise regulations
Construction of labor service entities
Labor service enterprise management
Four levels: high quality (Grade A1, A2), qualified (Grade B1, B2), unqualified (Grade C), and poor (Grade D)
High-quality (A1, A2 level) labor service companies are the main force in subcontracting operations and should be given key support and Participate in policy support such as bidding for heavy projects, high quality and low price, priority settlement, etc.
Qualified (B1, B2 level) labor service companies are the support for subcontracting operations and provide ample bidding opportunities.
Unqualified (C-level) labor service companies are prohibited from participating in global bidding activities within 1 year
Bad (D grade) labor service companies are not allowed to participate in new transactions for 3 years
"Co-discussion, co-construction, win-win, symbiosis, sharing, and common development" are the core concepts
Building a team of own skilled workers
Cultivate an industrialized team of construction workers in the new era
Labor management planning
Preliminary planning of labor management
1) Labor procurement must select labor service enterprises from the resource database at this level through Yunzhu.com for public bidding.
2) Before selecting a labor service company, the company/branch should organize an inspection in advance of the labor service company and the proposed project management team
3) The resource allocation plan must match the business scope and construction qualifications of the subcontracting unit
The "Project Department Implementation Plan" organized and compiled by the project department should be carried out in strict accordance with the "Labor Management Plan". It must be equipped with its own personnel such as labor service enterprise project managers, labor managers and other personnel to engage in management work in accordance with the provisions of the bidding documents.
It is advocated that the project department transfer the foreman function to the project subcontracting management team, and subcontracting plan control, labor management and resource allocation be upgraded to the project level.
Labor plan management
The labor manager of the project department should prepare the "Labor Management Plan" based on the "Implementation Plan of the Project Department", and the production manager organizes the plan writers to make briefings to all project managers.
The operation team submits the monthly progress plan and labor force plan to the project department plan administrator every month, and the on-site responsible engineer guides, reviews, and corrects the progress plan and labor organization plan prepared by the labor service enterprise.
After review by the project production manager, the plan administrator issues the labor input plan to the labor operation team
The project production manager organizes relevant personnel to inspect and evaluate the completion of the work objectives in the "Labor Management Plan" every month, and the inspection results are reported at the monthly project management meeting.
Contract management
Subcontract management
Sign a labor contract with migrant workers before subcontracting into the site, clarifying the payment methods and standards, payment methods, payment cycles, payment dates, and labor dispute settlement methods. The labor contract model text recommended by the government or the general contractor should be used.
Subcontracting units are directly responsible for the payment of wages to their farmers
Subcontracting units shall be fully responsible for the management of the real-name system for migrant workers
Subcontracting units should control their labor teams in terms of project construction, real-name system for migrant workers, internal settlement and payment, wage payment, etc., and be responsible for all their actions
The subcontracting unit should equip a reasonable number of full-time labor managers at the construction site according to the construction scale and the stipulations of the subcontracting contract, and at least one should be assigned. Full-time labor managers are responsible for labor contract signing, attendance, salary payment, real-name system management, etc.;
Before entering the construction site, the subcontracting unit should provide education and training to its management personnel, team leaders, and migrant workers in aspects such as production safety, work skills, rights protection, and compliance with laws and regulations.
Subcontracting units should accept the supervision and management of farmers’ wage payment by the general contracting unit
The general contractor's means for subcontracting: written warnings, requiring rectification within a time limit, or charging liquidated damages, confiscating the performance bond (deposit) or farmers' wage payment guarantee (deposit), suspending bidding qualifications, clearing the list of qualified suppliers, and entering the bad behavior list
The project implements a separate account system and the general contracting unit pays farmers' wages on behalf of the general contractor. The subcontracting contract should Includes the following:
1) The subcontracting unit shall promptly issue a letter of authorization to the general contracting unit for payment of farmers’ wages;
2) The total wages of farmers or their proportion in subcontracting payments and the wages paid to farmers by subcontracting units standards
3) The general contractor has the right to review the wage payment form submitted by the subcontractor. migrant workers in each issue The total amount of wages in the wage payment schedule cannot be higher than the total amount of subcontracting payments payable in that period.
Contract review
Subcontracting mode, scope, interface, construction period, quality, safety, completeness of list items, Price and payment method
sign a contract
It is strictly prohibited to enter the venue first and then sign the contract.
Labor contract management
Before the subcontractor enters the site
The labor manager of the subcontracting unit organized a trip to the designated location of the project to participate in admission education
Safety, technology, engineering, and labor conduct on-boarding education for subcontractors
If you pass the exam, you will sign a labor contract; if you fail, you will need to continue education.
After the labor contract is signed, the labor manager collects the personnel information of the subcontracting unit and registers it in the real-name management system
Signing of labor contract
The legal representative or authorized representative shall sign and seal it, and the worker of Party B shall sign and stamp it with his/her fingerprint.
Labor contract wages are divided into basic work and performance wages, and the basic wages are paid in full
3 copies, one copy filed by the project department, and image data retained. The labor contract signing rate is 100%
Labor contracts should be numbered and archived
Admission management
Admission preparation
One week before entry
Written notice: materials, personnel, materials; various admission requirements of the project department are attached as attachments
Ministry of Commerce: All relevant departments of the project department will explain their contractual obligations, liability for breach of contract, and management priorities.
first three days
The subcontractor informs the project department of the entry plan, and the project department arranges educational examinations, accommodation, etc.
Before entering the market
Verification: on-site management organization, personnel certification, labor relations, management model
Understand: management ability and construction ability, if you are unable to do the job, replace it
Admission education
Real cases, vivid images, exams
educational content
Project site work discipline
Three-level safety education for companies, projects and teams
Basic knowledge on the protection of the rights and interests of migrant workers: The subcontracting unit is the subject of signing the labor contract and paying wages. The main party responsible for payment and liquidation; the general contracting unit is the supervisory authority for farmers’ wage payment. management unit
Wage arrears complaint channels and rights protection channels
Negative consequences for seriously violating the work discipline of the project site, participating in illegal "wage demands", causing troubles, etc. include being expelled from the project site, being recorded in the bad behavior list, being detained by the public security department, and even judicially dealt with, etc.
Admission verification
On the day of entry
The labor manager collects relevant information about subcontracting units and submits them to various departments for review and filing.
Is the identity information of the migrant workers admitted consistent with their own identity?
Whether insurance is paid (personal accident insurance)
Subcontracting unit management personnel qualification information and subcontracting unit qualification documents
Subcontracting unit management personnel should be consistent with the bidding documents and perform their duties on site
Admission information
The labor manager organizes all project departments to participate in the subcontracting unit briefing meeting
Submit records and signatures, and sign admission commitment letter
Authorization
The subcontracting unit must submit a power of attorney for the legal representative of the management personnel on the day of entry.
Labor personnel management
General provisions for labor management
Wutong
Adhere to the same political treatment, the same requirements in work, and the same quality Improve, care about each other in life, and gain the same interests
Four modernizations
Qualification of labor subcontracting, certification of production safety, contracting of labor employment, and certification of operators
One supervisor
Strict supervision on wage payment of labor personnel
Branch companies and project departments must use a labor management information platform with one card as the core. Cloud, network, terminal
The project department should set up access control system and data connection
On-site management of labor personnel
Labor management engineers verify and record: labor agreements, labor rosters, identity documents, original labor contracts, physical examinations and health certificates, skill level certificates, salary cards, etc., and guide labor companies to use the labor management information platform
Qualified labor personnel will be entered into the real-name management system by the project labor management engineer.
Project labor management engineers provide regular admission education on management systems, safety, quality, environmental protection, labor protection, rights protection, "Ten Codes and Nine Chapters" etiquette, etc.
Labor statistics system with daily attendance and monthly summary
Real-name management
basic requirements
When the project department's labor manager collects rosters, attendance sheets, salary sheets and other reports every month, he should check whether the on-site roster employees have signed labor contracts and are consistent with the actual situation. After the workers enter the roster, the labor supervisor will number and update it according to the order in which the workers enter, ensuring that one number is assigned to each worker. When workers leave, the exit time will be added.
Labor real-name system information
Labor Contract
ID card information
My signature and handprint sample
Contact information
Type of work
Skills (professional title or position certificate) level
Admission Education Records
Attendance
Salary payment record
Credit history
Real-name employment contracts, real-name education and training, real-name entry verification, real-name employment and attendance, real-name wage payment, and real-name life management
The subcontracting unit shall report the entry and exit of workers to the project department within 3 days of personnel changes and handle the procedures in a timely manner as required.
Labor real-name management platform
Real-name management platform for construction workers (Yunzhu Labor Service)
Hardware facilities
Real-name access control system
AI face recognition multi-person capture function
Suppliers included in China State Construction Engineering Corporation’s centralized procurement winning bid list
In principle, closed management is implemented at the construction site
Real-name information or electronic files will be kept until 3 years after completion and all wages are paid.
Real-name management method for access control system projects that cannot be installed
Mobile attendance equipment uses biometric technology for clocking in and attendance
Prepare offline real-name attendance data
Supervision and management of farmers’ wage payment
Enterprise supervision and management
Subcontracting: direct responsibility; company: overall responsibility; project department is responsible for management
Daily supervision and management of the project department
The project department should be clear about the internal management status of subcontracting units and teams, the content of subcontracting contracts, the unit contracting price of teams, the attendance of subcontracting on-site personnel, the payment of wages to laborers, unstable labor matters, etc.
Supervise the payment of subcontracted wages
Establish management ledger
Collect and check monthly: rosters, attendance sheets, salary payment forms, bank statements, and salary announcement forms.
The wage payment form has the signature and fingerprint of the migrant worker and the seal of the subcontracting unit for confirmation.
Monthly random checks on workers
When workers leave the site, supervise the settlement of wages by subcontractors, and collect workers’ exit commitment letters from subcontractors
On-site and workers’ living areas: Construction workers’ rights protection information noticeboards, monthly attendance and wage payment schedules, public reporting hotlines and lists of responsible persons at all levels
Subcontracting issues: The subcontracting unit should be notified in writing and required to make rectifications within a time limit and collect liquidated damages; serious issues: the unit should charge liquidated damages, confiscate the performance bond or migrant workers’ wage payment guarantee, suspend bidding qualifications, remove qualified suppliers, and record bad behavior directory. Malicious delinquency: Report in a timely manner and obtain evidence to report the case to the relevant local authorities.
Account-sharing system and salary payment management
Account-sharing management
The principle of “one legal person, one province, one account” is used to open a special farmers’ salary account.
Registration with local human resources and social security departments and engineering construction authorities
When signing a general contract with the construction unit, you should try your best to agree on the proportion of labor costs to the project payment, and ensure that the agreed amount of labor costs is not less than the total wages of farmers.
Separate salary project fees from other expenses of subcontracting units. Make good fund arrangements when preparing monthly fund plans to ensure full payment.
The project department must review the sub-account settlement information submitted by the subcontracting unit on a monthly basis, and ensure that the monthly settlement is completed monthly
Pay wages on behalf of others
Signing an agency wage payment agreement for farmers with subcontracting units and banks
The subcontracting unit shall issue a letter of authorization to the general contracting unit for payment of farmers' wages before entering the site.
The subcontracting unit shall submit the attendance sheet and wage payment sheet signed by the workers to the project department every month.
After the labor specialist and business review are correct, the attendance sheet, settlement form (labor fee is listed separately), and wage payment form will be reported to the financial department. The financial report will be submitted to the branch office in charge. After approval, it will be submitted to the issuing bank, and the bank will deposit it into the migrant worker's personal account.
The subcontractor shall issue a "Declaration on Completion of the Current Wage Payment of Migrant Workers" to the general contractor. If there is still a situation of unpaid wages of migrant workers, the general contractor shall verify and issue the statement later.
When the general contracting unit pays farmers' wages to subcontracting units on its behalf, it does not exempt the subcontracting units from direct responsibility for the payment of farmers' wages.
The general contractor should first advance farmers' wages after verifying the facts of arrears and the specific amount of arrears, and then pursue compensation in accordance with the law and the contract.
Strengthen communication with subcontracting units that do not cooperate in the payment of wages. For subcontracting units that refuse to cooperate, proactively report the situation to relevant government departments when necessary and implement the general contractor's payment of wages to farmers.
Settlement management
Handle subcontracting monthly settlements in a timely manner, giving priority to ensuring the wages of migrant workers
In case of settlement disputes (including settlement disputes and excessive settlement time), enterprise guidance
If there is a settlement dispute with the subcontracting unit and an agreement cannot be reached, assess the risks, communicate with the government if necessary, and issue workers' wages under the witness of the competent department.
Exit management
Subcontractor exit management
The subcontracting unit shall notify the labor and management personnel at least 3 days in advance.
Salary payment verification
Settlement of wages for exiting personnel and verification of wages paid, prepare wage calculation forms and verify wage information, and submit to the project department with the official seal of the subcontracting unit's project manager and labor staff. The migrant workers themselves sign the wage calculation form and sign a letter of commitment to exit under the supervision of the labor and management staff of the project department.
Subcontracting unit withdrawal management
After wages are settled - apply for withdrawal
Each department shall verify whether all work has been completed and whether the wages of migrant workers have been paid, sign their opinions, and perform countersigning procedures.
The labor and management personnel update the labor real-name system platform and retain the paper version of the exit procedures
Credit management
blacklist system
Bad behaviors of laborers are entered into the real-name management platform for construction workers. Blacklisted laborers are prohibited from working on all bureau projects for 5 years
Mass incident and risk emergency management
Four levels: general, relatively large, major, and particularly major
emergency response
precursor stage
emergency stage
negotiation stage
The emotions of subcontracting unit personnel who gather crowds to hinder normal work are brought under control, and the project manager has a formal dialogue with the person in charge or representative of the subcontracting unit. At this stage, the company leader or project manager negotiates with the subcontracting unit.
resolution stage
When an agreement is reached with the person in charge or representative of the subcontracting unit, and the gathered subcontracting unit personnel have been evacuated, risks are under control, and normal production and office order has been restored
Reporting: All levels report to the supervisor at the same level in the premonitory and emergency stages.
Report and data management
The project department shall submit the "Monthly Report on Usage of Subcontracting Units" and "Real-name System Implementation Status" before the 25th of every month. "Status Statistics Table" to the branch engineering management department; the branch engineering department summarizes and reports before the 26th of each month to the company's engineering department.
Project labor management information
The project department's labor management system, dynamic evaluation and regular evaluation of subcontracting and supplying enterprises, emergency plan for labor disputes over wages and labor dispute handling records, settlement and payment information, etc.
Labor service enterprise files
Labor service enterprise business license, qualification certificate, safety production license, tax registration certificate, work-related injury insurance payment voucher, labor agreement between the labor service enterprise and the construction team, letter of commitment not to default on wages of labor service personnel, etc.
Labor personnel files
Roster, ID card, qualification and job skill certificate, health certificate, labor contract, social insurance, work-related injury insurance, safety education and training records, attendance sheet, salary payment sheet and image data, etc.
Procurement Management Measures
basic terminology
Yunzhu centralized procurement platform
It is a new upgrade of China Construction’s centralized procurement platform and a new “Internet” centralized procurement model.
purchase
The procurement referred to in these Measures refers to the procurement activities of materials, equipment, subcontracting, assets, services and other activities required to ensure the normal development of production and business activities.
Centralized purchasing
It refers to the single procurement business of certain categories of materials (equipment), labor and professional subcontracting, and service products of bureaus, companies, and branches above a certain amount or above a certain amount. According to the prescribed procurement process, on the CSCEC centralized procurement platform implementation of purchasing actions.
Centralized purchasing model
It refers to the general term for the participation forms of each branch enterprise in the implementation of procurement activities. It mainly includes: centralized procurement by the bureau headquarters, regional centralized procurement organized by the bureau headquarters (or regional joint procurement organized by joint-stock companies), company centralized procurement, and branch centralized procurement.
purchasing method
It refers to the general term for the methods used in the implementation of procurement activities.
Framework Agreement
It refers to the company and branch structures integrating the procurement needs of each unit, selecting the best suppliers through open competition, the two parties reaching an agreement on cooperation intentions, content, methods and other framework contents, and signing a purchase agreement within a certain period of time.
Procurement management organization and responsibilities
company level
Company Procurement Management Leadership Group
Corporate Procurement Working Group
The company's engineering department is the centralized management department for procurement work.
branch level
Branch Procurement Management Leading Group
Branch Procurement Working Group
The engineering department of the branch is the centralized management department for the procurement work of the branch.
Purchasing authority
Procurement authority hierarchical classification management
The company headquarters organizes and implements centralized procurement (Level I), and branches implement centralized procurement (Level II)
The company headquarters is mainly responsible for strategic centralized procurement of steel, bulk commercial concrete (China Construction Commercial Concrete), MRO (online sporadic materials), and other procurement items are authorized to be organized and implemented by each branch company.
Sporadic materials, wooden beams, formwork, tower cranes, construction elevators, temporary construction materials, prefabricated houses, container houses, some assets, etc. must be centralized purchased by the branch.
Temporary construction labor, pile foundation engineering professional subcontracting, main structure labor subcontracting, and CI engineering branches must implement centralized procurement
The project department does not have purchasing authority
Sporadic procurement of materials
Sporadic procurement of materials mainly includes low-value consumables such as hardware and electrical materials and temporary materials not used for engineering entities; sporadic procurement of the same material category shall not exceed 50,000 yuan, and the total amount shall not exceed 300,000 yuan. If the amount exceeds 300,000 yuan, special procurement is required. .
Procurement for special subcontracting and subsupply
For procurement categories at the branch level, the project department can apply to the branch for authorized procurement; for procurement categories at the company level, the project department/branch can apply for authorized procurement from the company (see attachment 15 for details on the approval process).
Procurement methods and scope of application
purchasing method
Bidding
public bidding
invitation to bid
Invitation-based bidding procurement is mainly applicable to situations where the technology is complex, has special requirements or is restricted by the natural environment, and only a small number of potential bidders are available; involving national security, state secrets or emergency rescue and disaster relief, which is suitable for bidding but not suitable for public bidding, such as military-civilian integration, etc. Confidential projects; projects that are not suitable for public bidding according to laws and regulations; projects that have special requirements for completion quality, service effects, etc., and subcontractors can only be selected within a specific range
Competitive Negotiation (Bid Negotiation)
Competitive negotiation refers to the way in which the purchaser directly invites three or more suppliers to negotiate on procurement matters. Competitive negotiation is mainly applicable when no supplier bids or there is no qualified bid after the bidding, or the re-bidding fails to be established. The technology is complex or of a special nature, and detailed specifications or specific requirements cannot be determined; the time required for bidding cannot meet the urgent needs of users.
single source purchasing
Single-source procurement is mainly applicable to: projects or materials supplied by the owner as subcontractors; the use of irreplaceable patents, proprietary technologies, or special requirements that result in procurement from a specific supplier; the professionalism of bureau-affiliated units Collaborative projects; other situations approved by the procurement management leading group at the same level
Yunzhu Preferred (MRO) Procurement
The company's purchasing department organizes negotiations with the e-commerce platform and signs a unified cooperation framework. According to the agreement/contract, each subordinate unit can place orders directly from the e-commerce platform to purchase specified categories of goods, without the need to organize separate bidding and sign a purchase contract.
Centralized procurement management
Overall requirements for centralized procurement
Three centralized procurement models are adopted: centralized procurement at the bureau headquarters, regional centralized procurement organized by the headquarters (or relying on joint regional joint procurement by joint-stock companies), and centralized procurement by companies (branch companies).
Procurement projects (materials, equipment, labor and subcontracting, assets, etc.) are divided into two categories: A and B: Category A is implemented at the bureau level for centralized procurement or authorized bureau-affiliated construction units to take the lead in organizing procurement; Category B is implemented at the company level (or authorized branch) company) implements centralized procurement.
If the bureau headquarters conducts centralized procurement, or the headquarters organizes regional centralized procurement (or relies on a joint-stock company's regional joint procurement), the project department within the company's centralized procurement area shall refer to the framework agreement signed between the joint-stock company or the bureau and the winning supplier, and draft the contract in accordance with the contract review process After reporting to the branch for approval, the implementation contract will be signed to fulfill the contract rights and obligations.
Centralized purchasing by the company
The company's centralized procurement refers to a centralized procurement model in which the engineering department of the company's headquarters takes the lead, integrates the demand of each branch, conducts centralized procurement, and signs a framework agreement or contract with suppliers.
Procurement and bidding procedures
Settlement and payment of centralized purchasing units
The settlement work of the company's centralized procurement winning bidders will be handled by the performance project department, and the payment will be carried out in accordance with the internal procurement agreement.
Centralized purchasing by branches
Centralized purchasing from sub-suppliers
Centralized procurement by branches and suppliers refers to the branch headquarters engineering department taking the lead.
Procurement and bidding procedures
Same company purchasing procedures
Settlement and payment of centralized purchasing units
The settlement work of the branch's centralized procurement winning bidder will be handled by the Contract Performance Project Department, and each branch will pay uniformly.
Centralized procurement of subcontractors
Centralized procurement of branch subcontractors refers to the branch headquarters engineering department taking the lead
When there is insufficient time for bidding in the early stage of the project and a subcontracting team needs to enter the site urgently, the centralized procurement winning bidder must be used; for sufficient bidding time, the bidding can be organized by the corresponding procurement level according to the procurement authorization, and the centralized procurement winning bidder will be given priority.
Procurement and bidding procedures
Same company purchasing procedures
Procurement Process and General Regulations
Shopping list
The project department submits the "Monthly Procurement Plan" (see Appendix 5 for details) to the branch company on a monthly basis, which belongs to the branch company. The company's centralized procurement shall be submitted by the branch engineering management department to the branch leader in charge for approval.
The company's engineering department supervises and assesses the progress of the implementation of the procurement plans of each branch.
Preparation and review of tender documents
Tender document template
The template of the bidding document prepared by the company's Ministry of Commerce should specify the parts that can be modified and the fixed clauses when used in bidding. In principle, it is prohibited to modify the fixed clauses in the template during bidding at all levels.
company level
The company's business management department will prepare bidding documents based on the list prices of different project types, and organize the company's procurement working group to review and conduct bidding.
branch level
The business management department of the branch shall prepare bidding documents based on project drawings, plans, general contract, etc., and organize the branch procurement working group to review and conduct bidding.
Tender document review content
(1) The Engineering Department is responsible for reviewing the subcontracting model, project section division, construction period, materials provided by the contractor and other relevant terms;
(2) The Finance and Capital Department is responsible for reviewing the payment ratio, payment method, tax and financial related terms;
(3) The Business Management Department is responsible for reviewing the measurement rules, pricing content, and business terms. During the review process, the "bid price" must be determined;
(4) The Technical Quality Department is responsible for reviewing technical requirements and quality standards;
(5) The Work Safety Supervision and Management Department is responsible for reviewing safety-related content;
(6) Other relevant business departments will review the bidding documents based on the bidding content;
General requirements for bidding suppliers
(1) Suppliers in the "Qualified Supplier List"; (2) Suppliers who have been inspected and approved have passed the qualification review of Yunzhu.com's resource library at this level.
Requirements for bidding suppliers: The number of suppliers participating in the bidding activities shall not be less than three, and the number of winning bidders shall be The quantity must be less than the number of bidding units (the number of winning suppliers in public bidding is "n". When n < 3, the number of bidding suppliers must satisfy 2n 1. When n ≥ 3, the number of bidding suppliers must satisfy n 3. That is Can).
After the bidding units participate in the registration, the engineering departments at all levels will pre-qualify the applicants;
If invitation bidding or competitive negotiation is adopted, the bidding unit shall be based on the project department, branch office, etc. Qualified suppliers recommended by companies and companies, and issue investments to suppliers with qualifications and good credit. Invitation letter. When inviting bids and competitive negotiations, the number of suppliers participating in the bidding must be no less than Standard number of marks × 2 1. Except for public bidding and single-source procurement, all other procurements are implemented For the real-name recommendation system, the "Supplier Bidding Recommendation Form" must be filled in (see attachment 6 for details); the project manager, Members of the branch leadership team, company department heads (inclusive) and above have the right to recommend.
Issuance, Q&A, changes and submission of bidding documents
After the review of procurement documents is completed, the corresponding procurement management department (the Materials and Equipment Department or the Contract Commercial Department for projects, the Engineering Department for branches and companies) will issue a bidding announcement on Yunzhu.com according to the hierarchical authorization. After the supplier registration and pre-qualification are completed, Bidding documents will be issued by the commercial management department at the corresponding level.
The Business Management Department is responsible for answering questions on procurement documents and issuing addendums.
The deadline for returning bids shall not be less than 3 days (inclusive)
Preparation and release of bid prices
The business management departments at all levels are responsible for the preparation and review.
It is given by the commercial management departments at all levels when reviewing the bidding documents (the unit price and project quantity are given according to the detailed list, and they need to be given before subcontracting and sub-supply bidding), and are released together with the bidding documents.
Tender opening process and general provisions
Open bid evaluation members
company level
In principle, the bid opening is held in the company, and branch offices send representatives to participate; branches involved in the bidding content send representatives to participate; in principle, the bid evaluation members are composed of department managers of the bidding working group. If the department manager is absent for some reason, he can authorize other members of the department to participate. And accept the supervision of the disciplinary inspection and supervision department, the number of people must be an odd number of 5 or more.
branch level
In principle, the bid opening will be held at the branch, and the project procurement leading group must send representatives to participate. In principle, the bid evaluation members shall be composed of the leader of the bidding working group, the deputy leader (at least one must participate), and the managers of each department of the bidding working group. When the manager is absent for some reason, he can authorize other members of the department to participate and accept the supervision of the disciplinary inspection and supervision department. The number of people must be an odd number of 5 or more.
Bid evaluation members who have close relatives, interests, or have been supervised by the Discipline Inspection Commission should voluntarily recuse themselves.
Division of labor among departments during bid opening
The Business Management Department is responsible for organizing relevant departments to participate in the bid opening meeting, and is responsible for evaluating commercial bids; and preparing the bid opening (evaluation) record form, bid evaluation record form (Attachment 8) and bid evaluation report (Attachment 9);
The Engineering Department is responsible for evaluating the comprehensive bid (project management section);
The Finance and Capital Department is responsible for checking whether each bidding unit has paid the bidding deposit, and evaluating the financial matters of the bidding unit;
The Technical Quality Department is responsible for evaluating technical bids;
The Work Safety Supervision and Management Department is responsible for evaluating the safety-related content in the comprehensive bid and technical bid;
The Legal Contract Department is responsible for evaluating comprehensive bids (legal affairs section);
Personnel from the Disciplinary Inspection and Supervision Department are responsible for logging into Yunzhu.com to open the quotations of each bidding unit, and supervise whether the entire process of bidding opening meets the requirements;
Bid evaluation rules
Evaluated lowest bid price method
The bidder with the lowest evaluated bid price will be the winning candidate (or the winning bidder will be recommended based on the number of suppliers to be selected, subject to a reasonable low price).
It is suitable for goods bidding projects that have general quality standards or where the bidder has no special requirements for quality or performance and the supplier has sufficient resources, or where the supply scale is small and the technical content is low.
cost performance evaluation method
For bid documents that meet the substantive requirements of the bidding documents, calculate the bid price for each valid bidder except for the price factor. Other scoring factors besides quality (technical performance, brand, reputation, performance, service, etc.) The aggregate score is divided directly by the bidder's bid price, and the bidder with the highest quotient is chosen. The winning bidder (or recommend the winning candidate based on the number of suppliers to be selected).
Suitable for companies with advanced technology and performance, high service standard requirements, or recruitment The bidder has special requirements for equipment bidding projects.
comprehensive bid evaluation method
When the tenderer has special requirements for the procurement subject matter or needs to select the best supplier, it can The price factor is quantitatively scored and calculated by weight together with the total score of each functional scoring factor. Calculate the comprehensive evaluation scores of the bidders, and the bidder with the highest comprehensive score will be the winning candidate (or Recommend winning bidders based on the number of suppliers to be selected).
Suitable for complex technologies or where the tenderer has special requirements for its technology and performance standards. requested bidding projects.
Bid evaluation procedure
preliminary review
Detailed review
Clarification and correction of bid documents
Inquiry
Bid evaluation results
After the bid evaluation is completed, the bid evaluation members need to sign and confirm the meeting minutes recording the bid opening (evaluation) process. The bid opening meeting minutes must have clear bid evaluation rankings and proposed bid-winning candidates. Bid opening at the branch and project department levels Minutes of the meeting must be signed by the chief economist of the branch
After the bid evaluation is completed, the centralized procurement management departments at each level (the branch level is reported by the engineering department) will report the bid evaluation results to the company's engineering department for publicity. The publicity period is 3 days (see the publicity form - attachment 10 for details). After the publicity is completed, press Bidding review and approval will be carried out based on the bidding authority (see Appendix 10 for details of the review process).
Bidding authority: Company-level bidding and procurement shall be reviewed by the general manager of the company's business management department and the general manager of the engineering department, and approved by the company's chief economist and vice president of production; subcontracting and sub-supply bidding by branch offices shall be reviewed by the branch engineering department manager and production vice president The general manager of the head office and branches shall review and approve the work by the person in charge of the branch (subcontracting of the main structural labor service or subcontracting with a bidding amount exceeding 10 million yuan must be reported to the company's engineering department for record);
Notification of winning bid
After the bid approval is completed, the procurement management department at the corresponding level will notify the winning bidder to pay (transferred) the performance deposit (or letter of guarantee) within a time limit. In principle, the bid winning notice will be issued after the successful bidder has paid (transferred) the performance deposit (letter of guarantee) in full. book (Appendix 11). If the winning bidder fails to pay in full and on time, the bidder will be disqualified, the bid deposit will be confiscated and the bidder will be prohibited from participating in bidding for other company projects within one year. At the same time, the bidder with the second highest bid ranking will be the bidder to be the winning bidder and pay a performance bond as required.
Other provisions
Strategic customer projects, bureau key projects, bureau investment projects, main structure and machinery of housing construction projects Electrical installation, etc. must use A-level labor services or professional subcontracting enterprises, and other resource allocations should be based on the latest developments. Priority will be given to the "A-level subcontracting and sub-supplying list" of the bureau.
After the bidding is completed, the supplier can enter the construction site only after paying the performance bond in full and signing and sealing the contract in accordance with the bidding documents.
The procurement work must be completed before the supplier enters the site, and it is strictly prohibited to enter the site without signing a contract.
During the public bidding process, if there are two failed bids due to reasons such as "blocking the bid price", bidding conditions and market conditions, etc., and the project resource demand time after the failed bid cannot meet the time for another public bidding, competitive negotiation can be directly used. purchase.
During the construction process, due to changes, negotiations, and on-site visa introduction of subcontracting and subsupply contracts, the company's "China Construction Seventh Engineering Bureau Subcontracting and Subsupply Settlement Management Implementation Rules" will be implemented.
Except for regional centralized procurement, the bidding time for individual procurement must be controlled within 30 days.
During the resource organization process in the early stage of the project, if emergency procurement occurs, the project department can report it to the branch Submit a written application, and the branch procurement organization will screen suitable resources and complete the package. After negotiating the main terms including unit price, payment method, etc., and signing a written commitment letter, the organization will enter the site. And complete relevant procedures within one month.
Contract management
Contract review and signing
Business process in accordance with the company's contract management regulations
Data management
Procurement management departments at each level (the engineering department at the company and branch level, the materials and equipment department at the project level, and the contract business department at the subcontracting level) are responsible for the collation, archiving, storage and submission of their procurement data.
Purchasing information type
Planning information
Monthly purchasing plan
Procurement process information
Including procurement application form, bidding documents and review materials, bidding documents, bid opening meeting sign-in form, bid opening (evaluation) record form, unit price confirmation letter, bid evaluation form, bid winning notice, etc. (Upload the signed scanned copy of the relevant information to Yunzhu net).
Statistical management reports
Procurement materials should be sorted out within seven days after the bid is awarded and numbered and filed in order.
Yunzhu.com centralized procurement platform
The company's engineering department uniformly configures the "Cloud Construction Network" procurement business process and related operator permissions
Reported by project contract commerce department to relevant project personnel
Margin management
Bid bond
A bid deposit not exceeding 2% of the estimated bidding price, temporary construction subcontracting, professional service subcontracting (security, tower crane and construction elevator drivers, construction slag removal, testing agencies, etc.), sub-supply and equipment leasing bidding and procurement and temporary When bidding for subcontracts with an estimated contract value of less than 500,000 yuan, in principle, no bid deposit is required. In special circumstances, non-payment needs to be reported to the company
High-quality (A1, A2 level) and excellent (BI level) suppliers are exempted from paying bidding deposits, and under the same conditions, priority will be given to successful bidders.
For those who have participated in the company's bidding and paid the bid deposit, but the company did not return it in time, the bid deposit can be used to transfer the paid bid deposit to participate in the bidding again.
Bidding units can pay an annual bid deposit of 100,000 yuan with the company. They will no longer pay a bid deposit for bidding within the year. If they win the bid, this part will be converted into a performance deposit, and they will need to pay a separate bid deposit when they participate in the company's bidding again.
The refund and transfer of the bid security deposit are initiated by the Engineering Department by filling out the "Approval Form for the Return (Transfer) of Bid Security Deposits for Subcontracting and Sub-Supply" (see the process form of the Finance and Capital Department for details). The bid security deposit of the winning bidder is directly converted into a performance security deposit and is no longer required. The bid deposit will be returned; the unsuccessful bidder will be refunded within 30 days after the winning bidder is determined.
performance bond
Performance bond payment ratio for subcontracting and sub-supply
A-level subcontractors shall pay a performance bond of 2% of the total price of the subcontract or a 5% bank performance guarantee; they can use the claims formed in other contracts to offset the performance bond; they can pay a performance bond of 3 million yuan to the bureau; they can also pay the company A performance bond of RMB 2 million is required as the upper limit (there is no upper limit for the performance bond). Once the bond reaches the upper limit, the performance bond is exempted.
B1-level subcontracting enterprises should pay a performance bond or a 7.5% bank performance guarantee of 2% of the total price of the subcontract; they can use the claims formed in other contracts to offset the performance bond; they can also pay a performance bond of 2 million yuan to the company as the upper limit ( There is no upper limit for the performance bond). Once the deposit reaches the upper limit, you can be exempted from paying the performance bond.
B2-level subcontracting enterprises should pay a performance bond or a 10% bank performance guarantee of no less than 3% of the subcontract price; they can use the claims formed in other contracts to offset the performance bond; they can also pay a performance bond of 2 million yuan to the company as a performance bond. There is an upper limit (there is no upper limit for the performance guarantee). Once the deposit reaches the upper limit, you can be exempted from paying the performance bond.
In principle, material and equipment lessors, professional service providers, temporary construction projects, and rescue and emergency projects do not need to pay performance bonds.
After the supplier completes its performance in accordance with the contract, the project engineering department will fill in the "Project Subcontracting and Sub-supply Performance Security Deposit Return (Transfer) Application Form"
For suppliers who have cooperated with the company for a long time, the claims formed in other contracts can be used to transfer the performance security deposit; the transfer process is initiated by the project business contract department by filling out the "Project Subcontracting and Sub-Supply Performance Security Deposit Return (Transfer) Application Form".
For special projects such as phased construction and trilateral projects, the performance bond can be paid in installments after being approved by the general manager's office meeting of the branch and then reported to the company's general manager's office meeting for approval.
Procurement supervision and management
The Discipline Inspection and Supervision Department of the company is the supervisory department of the company's bidding and procurement, responsible for the process supervision of the bidding and procurement work; the branch company shall establish a supervision group with members of the discipline inspection team as members, responsible for the process supervision of the bidding and procurement work; the project department shall be established with a project secretary , Disciplinary Inspection Team members are members of the supervision team, which is responsible for the process supervision of the bidding and procurement work of this project.
project management standards
11243 core ideas
a core
Taking project cost management as the core
a main line
Focus on the entire life development process of the project
Second level management
Standardize the two-tier management of the enterprise and project department
four basic files
"project proposal"
"Project Cost Budget"
"Project Management Objective Responsibility Letter"
"Project Department Implementation Plan"
Three basic reports
"Project Daily Status Report"
"Project Business Monthly Report"
"Project Manager Monthly Report"
Project size classification
Lean Construction Guidelines
General principles
Management philosophy
Keep improving and fulfill the contract perfectly
management objectives
Perfect fulfillment, win-win value
Management core
Plan and schedule
guiding ideology
Comprehensive program management
Dimensions
time
space
Auxiliary management tools
Layout plan
Process flow chart
Typical process interspersed construction period model
Resource allocation time model
pass
Comprehensively sort out the process
Reasonable division of flow sections
Refining process interspersed nodes
Optimize resource allocation
Control key project nodes
Purpose
Avoid idle work surfaces
Reduce wasted work and rework
Shorten the construction period
reduce waste
Achieve quality and efficiency improvement
design and technology
Design Optimization
Reduce redundant processes
Solution optimization
Improve work efficiency, reduce material waste, and save costs
Measure optimization
Improve construction safety and convenience
Contracts and Procurement
Construction conditions, project characteristics, owner status
Establish the best contract system
Reasonable interface division
Avoid missing items in contracts between different professions
Prepare the procurement plan based on the overall project schedule, contract system and inspection results of various resources.
Reduce idle working surfaces and achieve the goal of zero idle work
Quality Control
The first is to set a good example and lead the way
The second is the identification, prevention and control of quality risks and common diseases
The third is to conduct comprehensive actual measurements
Energy Saving and Green Construction
Comprehensive application of the "Engineering Project Site Standardization Atlas"
Energy Consumption Reduction Executive Bureau's "Green Construction Technology Implementation Manual", "Green Construction Evaluation Standards"
The masonry work should be inserted when the main body of the structure is constructed to (1/2) height, ensuring that the difference between the masonry floor and the structural construction floor is no more than 6 floors
The car ramp must be constructed at the same time as the structure to ensure that the ramp is open to traffic within (1) month after the garage is capped to facilitate the transportation of basement materials.
When the main body construction reaches the (4th) floor height, the construction elevator begins to enter the site for installation to meet the smooth progress of the masonry project.
production manager
Things to do
Must do when starting work
Project department implementation plan
Man-machine-material wage cycle
"Project Subcontracting Management Plan"
"Project Materials Management Plan"
"Project Equipment Management Plan"
"Project Duration Management Plan"
"Project Environmental Management Plan"
"Public Resource Management Plan"
Develop a general layout plan for the site and organize the construction of temporary facilities
Zongping and Linjian
Organize and carry out on-site verification of subcontracted enterprises and conduct management clarifications
Verification and disclosure
Organize and formulate the overall progress plan (three-level node plan), year, month, and week plans, and do a good job in on-site production organization and coordination before the start of construction
plan
Must do every day
"Project Daily Status Report"
Construction site management, production organization and coordination, control
Must do every week
Organize weekly construction site meetings
Organize and carry out inspections on dust control situations
Organize and carry out safety hazard inspections
Must do every month
Organize the preparation of monthly plans (progress plan, work plan, resource allocation plan) and organize their implementation
Organize monthly progress plan assessment
Organize and carry out monthly inventory of project materials
Must do when finished
Organize and carry out exit procedures for subcontracting enterprises
Develop on-site cleanup work plan and organize project cleanup work
Job responsibility system
organize
Conscientiously implement and implement national policies, laws and regulations; be fully responsible for the organization of human and material resources before the project enters the site and the management of the construction site after the entry; preside over the work of the project department.
Target
Complete various indicators assigned to the project department on time to ensure the realization of project quality, safety, and construction period goals, and conscientiously perform the construction contract.
plan
Responsible for presiding over the preparation and organization of the implementation of the construction progress plan of the construction contract, and reporting the physical completion amount of the project to the project manager on time.
quality
Work strictly in accordance with the quality management system of the project, achieve project quality goals as required, and be responsible for organizing the assessment of various technical, quality, safety, cost and other related staff and positions of the project department
overall planning
Reasonably and uniformly arrange the management of project materials, labor force, construction technology, equipment, civilized construction, etc.
technology
Actively maintain a good working relationship with engineering and technical personnel to avoid losses caused by technical errors during the construction process. Organize self-review and joint review of project drawings, and promptly resolve various technical problems that arise during construction
Technical quality in-house
Responsible for various technical briefings, organize technical personnel to learn and implement technical regulations, specifications, and quality standards, and check the implementation at any time. Host quality meetings, make rectification measures for quality issues raised by owners and supervisors, and supervise timely handling
Technical quality field
Actively go deep into the construction site to understand construction trends and solve major technical and quality problems that arise during construction. Responsible for weekly and monthly construction progress arrangements; technical responsibility for the construction quality of the project. Supervise and inspect the construction quality of the work team and construction personnel, ensure that the project is constructed according to the design drawings and specifications, and be responsible for organizing quality inspection and assessment work
Safety production responsibility system
organize, take charge
Organize project construction and production, and take primary leadership responsibility for the project's safe production
regulations
Organize the implementation of laws, standards, norms and rules and regulations on production safety, and regularly inspect the implementation
implementation, explanation
Organize and implement special safety plans and technical measures, and inspect and guide safety technical briefings
acceptance
Organize the acceptance of on-site mechanical equipment, safety facilities and fire protection facilities
examine
Organize safety production and civilized construction inspections, and implement rectification of discovered problems
educate
Responsible for the safety education of project management personnel and improve the safety awareness of management
Meet the standard
Organize projects to actively participate in various safety production and civilized construction compliance activities
emergency
In the event of a casualty accident, handle it according to the emergency plan, organize rescue personnel, and protect the scene.