MindMap Gallery Construction project full cycle management process
This is a mind map about the full cycle management process of construction projects. The main contents include: 1. Contents provided by the Planning Commission, 2. Approval of preliminary design, 3. Bidding process and filing materials, 4. Processing of construction permits, 5. Fire protection design review of special construction projects, 6. Processing of resumption of work procedures, 7. Supervision of construction process, 8. Completion acceptance units and departments, 9. Completion acceptance content (programme tasks), 10. Completion acceptance filing materials for housing construction and municipal infrastructure projects, 11. Fire protection acceptance or filing materials for construction projects.
Edited at 2025-08-14 14:59:53Avatar 3 centers on the Sully family, showcasing the internal rift caused by the sacrifice of their eldest son, and their alliance with other tribes on Pandora against the external conflict of the Ashbringers, who adhere to the philosophy of fire and are allied with humans. It explores the grand themes of family, faith, and survival.
This article discusses the Easter eggs and homages in Zootopia 2 that you may have discovered. The main content includes: character and archetype Easter eggs, cinematic universe crossover Easter eggs, animal ecology and behavior references, symbol and metaphor Easter eggs, social satire and brand allusions, and emotional storylines and sequel foreshadowing.
[Zootopia Character Relationship Chart] The idealistic rabbit police officer Judy and the cynical fox conman Nick form a charmingly contrasting duo, rising from street hustlers to become Zootopia police officers!
Avatar 3 centers on the Sully family, showcasing the internal rift caused by the sacrifice of their eldest son, and their alliance with other tribes on Pandora against the external conflict of the Ashbringers, who adhere to the philosophy of fire and are allied with humans. It explores the grand themes of family, faith, and survival.
This article discusses the Easter eggs and homages in Zootopia 2 that you may have discovered. The main content includes: character and archetype Easter eggs, cinematic universe crossover Easter eggs, animal ecology and behavior references, symbol and metaphor Easter eggs, social satire and brand allusions, and emotional storylines and sequel foreshadowing.
[Zootopia Character Relationship Chart] The idealistic rabbit police officer Judy and the cynical fox conman Nick form a charmingly contrasting duo, rising from street hustlers to become Zootopia police officers!
Construction project full cycle management process
1. Contents of the Planning Commission
(Involved in the department: Quality and Safety Center, Construction Market Stock, Fire Supervision Stock, Urban and Rural Construction Stock, Urban and Rural Management Stock)
Planning Compliance Review (Urban and Rural Development Unit)
Policy compliance: Whether to implement policy requirements such as urban renewal, sponge cities, and barrier-free environment construction (according to the "Sponge City Construction Evaluation Standards" GB/T51345, etc.)
Architectural design and engineering feasibility
Technical Review of Building Plan (Fire Supervision Unit): Whether the fire passages and climbing surfaces are in compliance with the "Building Design Fire Protection Code" (GB50016)
Municipal supporting capacity (Urban and rural management unit)
Access conditions for municipal water supply and drainage, heating, gas and other facilities (according to the "Comprehensive Planning Specifications for Urban Engineering Pipelines" GB50289)
Standardized construction of community heat exchange stations (based on the "Technical Guidelines for the Construction and Renovation of Standardized Heat Stations in Inner Mongolia Autonomous Region")
Completion acceptance of heating projects (according to Article 11 of the "Inner Mongolia Autonomous Region Urban Heating Management Regulations")
Installation of new building heating system equipment (according to Article 14 of the Inner Mongolia Urban Heating Management Regulations)
Warranty liability for newly built heating systems (the warranty period is five heating periods, according to Article 15 of the "Inner Mongolia Autonomous Region Urban Heating Management Regulations")
Natural gas pipelines within the red line are included in the community development (based on the internal development and reform price number (2018) No. 319)
Traffic Impact (Urban and Rural Development Unit): Whether the traffic impact assessment has passed (large-scale projects require special review)
Special project requirements (Urban and Rural Management Section): Application and Approval Procedure for the Historical and Cultural Protection Area Project (according to Articles 24, 28, and 29 of the "Regulations on the Protection of Historical and Cultural Cities, Towns and Villages")
Facade renovation (public construction) (quality and safety center)
People's livelihood and public interest protection
Supporting charging piles (Urban and rural construction stock)
Elevator installation (quality safety center)
Cross-departmental collaborative matters
Travel demand for surrounding road networks (Urban and rural construction stocks)
"Good house, good community" (Quality and Safety Center)
2. Approval of preliminary design
Involved in the department: Urban and Rural Development Department
3. Bidding process and filing materials
Involved in the department: Construction Market Stocks, Administrative Approval Office
Registration requirements: Issue a bidding announcement/ Bid invitation 5 days ago, file with the construction administrative department at or above the county level in the project
Registration materials required by the Administrative Approval Office
Survey and design tender documents: project proposal/feasibility study approval, tender documents and fair competition review report, tender agency extraction registration form, etc.
Construction and supervision bidding documents: feasibility study report approval, preliminary design approval, bidding documents and fair competition review report, bidding agency extraction registration form, etc.
Bidding documents for important equipment and materials: feasibility study report approval, preliminary design approval, bidding documents and fair competition review report, bidding agency extraction registration form, etc.
Bidding documents for projects owned by state-owned enterprises: project filing procedures, funding and technical information commitments, bidding documents and fair competition review reports, bidding agency extraction registration form, etc.
Construction market stocks' full process supervision
Pre-tender management: review the bidder qualifications, bidding conditions, bidding documents and terms, and issue the "Enterprise Transaction Review Form for Engineering Construction Projects"
Tendering process supervision: supervise the release of bidding information, bid opening procedures, bid evaluation expert selection and review process
Post-Bid registration management: collect bidding reports, filing materials (including paper and electronic versions) submitted within 15 days after winning the bid, and verify illegal and irregular behaviors.
4. Construction permit application
Involved by the department: Administrative Approval Office
Required materials
Construction winning notice and construction contract (projects that should be bid)
Real estate certificate
Construction project planning permit and attachments
Construction drawing design review certificate
Apply for a construction project construction permit commitment letter (including quality and safety measures and funds)
5. Fire protection design review for special construction projects
Departments involved: preliminary review of the Administrative Approval Office and re-examination of the Fire Supervision Department
Materials required by the Administrative Approval Office
Fire Design Review Application Form
Fire protection design file (disc)
Temporary building approval documents (if required)
Special fire protection design technical information
Construction project planning permit documents (if required)
"Construction Drawing Fire Inspection Report"
Regulatory basis: Article 10 of the Fire Protection Law of the People's Republic of China, Article 15, Article 26, and Article 33 of the "Interim Provisions on the Review and Acceptance of Fire Protection Design of Construction Engineering"
6. Processing of resumption of work procedures
Materials required for quality and safety center
Quality-related: Construction/Supervision winning notice, construction drawing review certificate, contract, project leader and organization composition, lifelong quality responsibility commitment letter, smart construction site access, etc.
Safety related: safety condition review letter, work-related injury insurance, production safety liability insurance, smart construction site access, safety and civilization measures and fee plan, list of dangerous projects, construction organization design, supervision planning, full-time safety officer equipment, qualification certificate, safety management agreement, safety management system, dust control "six hundred percent" etc.
Materials required for construction market stocks
Real-name platform establishment situation
Implementation of project payment guarantee
Special account for wages for migrant workers and deposit payment
Materials required for quality safety shares
Construction permit, planning permit, construction drawing review, fire protection design review
Conditions for the performance of duties of the five responsible entities (quality lifelong responsibility commitment letter, project leader qualification, etc.)
Construction site preparation (site leveling, fence, temporary facilities, etc.)
Safety production conditions (special plans, safety protection, mechanical equipment filing, etc.)
Data and systems (construction organization design, quality and safety system, etc.)
Materials required for decoration engineering technical service center
Quality-related: Construction/Supervision winning notice, construction drawing review certificate, contract, project leader and organization composition, lifelong quality responsibility commitment letter, smart construction site access, etc.
Safety related: construction unit production safety license, project overview, safety measures cost plan, on-site layout drawing, personnel certificate, safety liability insurance, etc.
7. Construction process supervision
Involved in the department: Quality and Safety Center, Construction Market Stock, Quality and Safety Stock, Decoration Engineering Technical Service Center, Fire Supervision Section
Quality and Safety Center Supervision
Construction safety supervision: random inspection of responsible entities performing their duties, implementing laws and regulations, standardizing production safety, participating in accident investigation, handling complaints, etc.
Construction quality supervision: random inspection of the implementation of regulations and quality management systems, investigate illegal and irregular behaviors, handle complaints, participate in quality accident investigation, supervise completion acceptance
Construction market stock supervision
Real-name platform check-in status
Payment of wages for construction workers
The allocation of labor costs for construction units
Project payment and salary accounting management situation
Employment ledger establishment status
Establishment of rights protection signs
Quality and safety stock supervision
Management personnel qualifications, on-the-job performance, safety responsibilities implementation, and special operation personnel review
Project quality (comply with design and standards, material and equipment acceptance, etc.)
Construction safety (safety protection, hazard source control, personnel safety, etc.)
Conduct compliance (construction permit, construction according to drawings, etc.)
Environmental protection and civilized construction (dust, noise, garbage disposal, etc.)
Emergency management (emergency plans, drills, etc.)
Supervision of the Decoration and Decoration Engineering Technical Service Center
Quality supervision: material equipment quality (certificate of conformity, re-examination report), structural safety, key processes, and acceptance of hidden projects
Safety supervision: safety systems, personnel protection, temporary facilities, fire safety, hidden danger investigation and rectification
Fire Supervision Department Supervision
8. Participating units and departments in the completion acceptance
Housing and Urban-Rural Development Bureau: Quality Safety Stock, Fire Supervision Section, Quality Safety Center, Decoration and Decoration Engineering Technical Service Center, Construction Market Section
Others: Development and Reform Commission, Natural Resources Bureau, Public Facilities Operation Unit, Fire Rescue Brigade, Streets, Community
9. Completion acceptance content (programme tasks)
Involved in the department: Quality Safety Center, Quality Safety Department, Fire Supervision Department, Decoration and Decoration Engineering Technical Service Center
Quality and Safety Center Acceptance
Acceptance conditions: Complete design and contract content, construction / supervision / survey / design unit quality documents, technical files complete, material and equipment test report, project payment, quality warranty, household acceptance qualification, rectification completion, etc.
Acceptance procedures: The construction unit submits the completion report, the construction unit organizes the acceptance group, notifies the supervision agency, on-site acceptance, form opinions, submit acceptance report
Acceptance report content and filing requirements
Quality and safety stock acceptance
Inspection procedure supervision: acceptance conditions verification, acceptance organizational form supervision, standard and specification validity inspection
Acceptance of Decoration Engineering Technical Service Center
Inspection procedure supervision: acceptance conditions, organizational form, and effectiveness of standards and specifications
Project entity quality random inspection: suspended ceiling, floor, wall decorative tiles, doors and windows, electrical installation, etc.
Engineering data verification: quality control data, functional testing data, special acceptance data
Inspection process and conclusion supervision and rectification tracking
10. Completion and acceptance of housing construction and municipal infrastructure projects
Construction project completion acceptance filing form
Residential quality assurance certificate, residential instruction manual
Construction project quality supervision report
Survey/Design/Supervision Unit Quality Report
Construction project warranty
Construction project quality responsibility system
Construction project completion acceptance report
11. Fire protection acceptance or filing materials for construction projects
Fire inspection or filing random inspection application form
Project completion acceptance report
Complete drawings of construction projects involving fire protection (CD)
Fire inspection report for completion acceptance
Fire protection facilities inspection report for construction projects
Report on the three-party responsible subjects (2021 edition)
12. Archive data storage
Storage information of urban construction archives room for construction projects (specific contents are to be added)